enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. USNS Catawba - Wikipedia

    en.wikipedia.org/wiki/USNS_Catawba

    She was launched on 22 September 1979, and christened by Mrs. James R. Derusha, wife of the president of Marinette Marine. The ship was delivered to the Navy on 28 May 1980. [5] Catawba's hull is built of welded steel plates. The ship is 225 feet 11 inches (68.86 m) long, with a beam of 42 feet (13 m), and a draft of 15 feet (4.6 m).

  3. List of ship directions - Wikipedia

    en.wikipedia.org/wiki/List_of_ship_directions

    Outboard: attached outside the ship. [20] Port: the left side of the ship, when facing forward (opposite of "starboard"). [1] Starboard: the right side of the ship, when facing forward (opposite of "port"). [1] Stern: the rear of a ship (opposite of "bow"). [1] Topside: the top portion of the outer surface of a ship on each side above the ...

  4. HMS Glasgow (F88) - Wikipedia

    en.wikipedia.org/wiki/HMS_Glasgow_(F88)

    On 18 April 2021, the fore section of the ship moved out from its building shed on the Clyde. On 1 May 2021, was joined with its aft section for the first time. [23] [24] In October 2022, the Secretary of State for Defence, Ben Wallace, stated that the initial operating capability (IOC) for the ship had slipped from 2027 to 2028. [25]

  5. USNS Chauvenet (T-AGS-29) - Wikipedia

    en.wikipedia.org/wiki/USNS_Chauvenet_(T-AGS-29)

    USNS Chauvenet (T-AGS-29) was a multi-function (littoral, coastal and deep ocean) survey ship laid down on 24 May 1967, at Upper Clyde Shipbuilding Corp., Glasgow, Scotland. The ship was the second survey ship, Chauvenet (AGS-11) being the first, named for William Chauvenet (1820-1870). He was instrumental in the founding of the United States ...

  6. Fitting out - Wikipedia

    en.wikipedia.org/wiki/Fitting_out

    While still afloat, its construction is then continued. Depending on the type of vessel, fitting-out can last weeks or many months. Vessels with comparatively little space for human occupation, such as oil tankers, bulk carriers and container ships, can take the least time for fitting.

  7. Afterdeck - Wikipedia

    en.wikipedia.org/wiki/Afterdeck

    In place of the afterdeck, a ship may be built with a poop deck, that is a deck that forms the roof of a cabin built in the rear, or "aft", part of the superstructure of a ship; a poop deck is usually higher up than an afterdeck. A ship may have its superstructure or aftercastle located in the stern and thus not have an afterdeck. The stern and ...

  8. Transom (nautical) - Wikipedia

    en.wikipedia.org/wiki/Transom_(nautical)

    Vertical transom and stern of a modern cargo ship. In some boats and ships, a transom is the aft transverse surface of the hull that forms the stern of a vessel. Historically, they are a development from the canoe stern (or "double-ender") wherein which both bow and stern are pointed. Transoms add both strength and width to the stern.

  9. Shipbuilding contract - Wikipedia

    en.wikipedia.org/wiki/Shipbuilding_contract

    Shipbuilding contract, which is the contract for the complete construction of a ship, concerns the sales of future goods, so the property could not pass title at the time when the contract is concluded. The aim of shipbuilding contract is to regulate a substantial and complex project which the builders and buyers assume long-term obligations to ...