enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  3. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw (which we call full load). For example, an oversized motor - 15 kW - drives a constant 12 kW load whenever it is on. The motor load factor is then 12/15 = 80%.

  4. Cooling load temperature difference calculation method

    en.wikipedia.org/wiki/Cooling_load_temperature...

    The first of the cooling load factors used in this method is the CLTD, or the Cooling Load Temperature Difference. This factor is used to represent the temperature difference between indoor and outdoor air with the inclusion of the heating effects of solar radiation. [1] [5] The second factor is the CLF, or the cooling load factor.

  5. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    Base load plants usually have low costs per unit of electricity because they are designed for maximum efficiency and are operated continuously at high output. Geothermal power plants , nuclear power plants , coal-fired plants and bioenergy plants that burn solid material are almost always operated as base load plants, as they can be difficult ...

  6. Nameplate capacity - Wikipedia

    en.wikipedia.org/wiki/Nameplate_capacity

    Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity, maximum effect or gross capacity, [1] is the intended full-load sustained output of a facility such as a power station, [2] [3] electric generator, a chemical plant, [4] fuel plant, mine, [5] metal refinery, [6] and many others.

  7. Load profile - Wikipedia

    en.wikipedia.org/wiki/Load_Profile

    In a power system, a load curve or load profile is a chart illustrating the variation in demand/electrical load over a specific time. Generation companies use this information to plan how much power they will need to generate at any given time. A load duration curve is similar to a load curve. The information is the same but is presented in a ...

  8. Power rating - Wikipedia

    en.wikipedia.org/wiki/Power_rating

    The service factor is typically in the 1.15-1.4 range, with the figure being lower for higher-power motors. For every hour of operation at the service-factor-adjusted power rating, a motor loses two to three hours of life at nominal power, i.e. its service life is reduced to less than half for continued operation at this level.

  9. Power-to-weight ratio - Wikipedia

    en.wikipedia.org/wiki/Power-to-weight_ratio

    A typical turbocharged V8 diesel engine might have an engine power of 250 kW (340 hp) and a mass of 380 kg (840 lb), [1] giving it a power-to-weight ratio of 0.65 kW/kg (0.40 hp/lb). Examples of high power-to-weight ratios can often be found in turbines.