enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Front-end loading - Wikipedia

    en.wikipedia.org/wiki/Front-end_loading

    Front-end loading (FEL), also referred to as Front-End Engineering Design (FEED), Front End Planning (FEP), pre-project planning (PPP), and early project planning, is the process for conceptual development of projects in processing industries such as upstream oil and gas, petrochemical, natural gas refining, extractive metallurgy, waste-to-energy, biotechnology, and pharmaceuticals.

  3. Feed manufacturing - Wikipedia

    en.wikipedia.org/wiki/Feed_Manufacturing

    The formulation procedure has both fixed and variable portions. Swine rations are generally based on a ground cereal grain as a carbohydrate source, soybean meal as a protein source, minerals like calcium and phosphorus are added, and vitamins. The feed can be fortified with byproducts of milk, meat by-products, cereal grains; and "specialty ...

  4. Feedlot - Wikipedia

    en.wikipedia.org/wiki/Feedlot

    Many feed companies are able to be prescribed a drug to be added into a farms feed if required by a vet. Farmers generally work with nutritionists who aid in the formulation of these rations to ensure their animals are getting the recommended levels of minerals and vitamins, but also to make sure the animals are not wasting feed in their manure ...

  5. U.S. Route 75 - Wikipedia

    en.wikipedia.org/wiki/U.S._Route_75

    The first freeway in Texas was a several-mile stretch of US 75 (now I-45)—The Gulf Freeway—opened to Houston traffic on October 1, 1948. The stretch of US 75 between I-30 and the Oklahoma state line has exits numbered consecutively from 1 to 75 (with occasional A and B designations), excluding 9-19.

  6. South Dakota Highway 75 - Wikipedia

    en.wikipedia.org/wiki/South_Dakota_Highway_75

    This is the third use of the South Dakota 75 designation. The first South Dakota 75 was designated around 1934, in southeast Shannon County. It was originally 10 miles (16 km) long, with its northern terminus at U.S. Highway 18. When that route was realigned southward, SD 75 was shortened to 3 miles (4.8 km).

  7. Pig farming - Wikipedia

    en.wikipedia.org/wiki/Pig_farming

    Pigs are extensively farmed, and therefore the terminology is well developed: Pig, hog, or swine, the species as a whole, or any member of it. The singular of "swine" is the same as the plural. Shoat (or shote), piglet, or (where the species is called "hog") pig, unweaned young pig, or any immature pig [23] Sucker, a pig between birth and weaning

  8. Interstate 75 - Wikipedia

    en.wikipedia.org/wiki/Interstate_75

    Interstate 75 (I-75) is a major north–south Interstate Highway in the Great Lakes and Southeastern regions of the United States.As with most Interstates that end in 5, it is a major cross-country, north–south route, traveling from State Road 826 (SR 826, Palmetto Expressway) and SR 924 (Gratigny Parkway) on the Hialeah–Miami Lakes border (northwest of Miami, Florida) to Sault Ste. Marie ...

  9. Plan (drawing) - Wikipedia

    en.wikipedia.org/wiki/Plan_(drawing)

    Plans are usually "scale drawings", meaning that the plans are drawn at a specific ratio relative to the actual size of the place or object. Various scales may be used for different drawings in a set. For example, a floor plan may be drawn at 1:48 (or 1/4"=1'-0") whereas a detailed view may be drawn at 1:24 (or 1/2"=1'-0").