The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
Public sector undertaking National Thermal Power Corporation (NTPC) and several other state level power generating companies are engaged in operating coal-based thermal power plants. Apart from NTPC and other state level operators, some private companies also operate the power plants. [9] One coal plant was given environmental clearance in 2021 ...
[14] [15] Present equity holding is 100% by ntpc and now it's not a joint venture but is a wholly owned subsidiary company of ntpc. The company renovated and modernized the existing unit.The total cost of its renovation and modernization has been over Rs. 500 crores. In March 2013, the renovation work of two old units was completed.
The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...
All units functional 2 NTPC Korba: Chhattisgarh: 2,600 3x200, 4x500 All units functional 3 NTPC Ramagundam: Telangana: 2,600 3x200, 4x500 All units functional. 4. Farakka Super Thermal Power Station: West Bengal: 2,100 3x200, 3x500 All units functional 5 Vindhyachal Super Thermal Power Station: Madhya Pradesh: 4,783 6x210, 7x500, 2x4, 1x15 All ...
Vallur Thermal Power Station is a power plant located in Vallur, Thiruvallur district, India.The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each.
Unit-1 of stage-2 commissioned in November 2013. [10] Unit-2 of stage-2 commissioned in March 2015. The first unit (of stage-I) of NTPC Barh is expected to start generation from December 2019 instead of the scheduled August 2020, [11] while the second and third units of stage-I will be made operational in December 2020 and August 2021, respectively.
Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India.