The Reactor Protection System (RPS) is a system, computerized in later BWR models, that is designed to automatically, rapidly, and completely shut down and make safe the Nuclear Steam Supply System (NSSS – the reactor pressure vessel, pumps, and water/steam piping within the containment) if some event occurs that could result in the reactor entering an unsafe operating condition.
An LPCI is an emergency system which consists of a pump that injects a coolant into the reactor vessel once it has been depressurized. In some nuclear power plants an LPCI is a mode of operation of a residual heat removal system, also known as an RHR or RHS but is generally called LPCI. It is also not a stand-alone valve or system.
The Fukushima Daiichi nuclear disaster in 2011 occurred due to a loss-of-coolant accident. The circuits that provided electrical power to the coolant pumps failed causing a loss-of-core-cooling that was critical for the removal of residual decay heat which is produced even after active reactors are shut down and nuclear fission has ceased.
Another example was the Isolation Condenser system, which relied on the principle of hot water/steam rising to bring hot coolant into large heat exchangers located above the reactor in very deep tanks of water, thus accomplishing residual heat removal. Yet another example was the omission of recirculation pumps within the core; these pumps were ...
Following the reactor SCRAM, operators activated the reactor core isolation cooling system (RCIC) and the residual heat removal system and core spray systems were made available to cool the suppression pool; whether they were activated prior to the tsunami has not been made clear. The RHRS and CS pumps were knocked out of commission by the tsunami.
The AHWR incorporates several passive safety features. These include: Core heat removal through natural circulation; direct injection of emergency core coolant system (ECCS) water in fuel; and the availability of a large inventory of borated water in overhead gravity-driven water pool (GDWP) to facilitate sustenance of core decay heat removal.
When pressure control is lost in a reactor plant, depending on the level of heat being generated by the reactor plant, the heat being removed by the steam or other auxiliary systems, the initial pressure, and the normal operating temperature of the plant, it could take minutes or even hours for operators to see significant trends in core behaviour.
Initially the high pressure coolant injection (HPCI) system was primary cooling the core and at 15:00 operators activated the residual heat removal system main pump and the containment vessel spray pump at 15:07 to cool the suppression pool; all these systems failed following both AC power and DC power loss after the tsunami as the diesel ...