Search results
Results from the WOW.Com Content Network
Troubleshooting is a form of problem solving, often applied to repair failed products or processes on a machine or a system. It is a logical, systematic search for the source of a problem in order to solve it, and make the product or process operational again. Troubleshooting is needed to identify the symptoms.
Westinghouse Electric Company LLC is an American nuclear power company formed in 1999 from the nuclear power division of the original Westinghouse Electric Corporation. [3] It offers nuclear products and services to utilities internationally, including nuclear fuel , service and maintenance, instrumentation, control and design of nuclear power ...
Steam turbine generator: The first commercial Westinghouse steam turbine-driven generator, a 1,500 kW unit, began operation at Hartford Electric Light Co. in 1901. The machine, nicknamed Mary-Ann, was the first steam turbine generator to be installed by an electric utility to generate electricity in the US.
A black start is the process of restoring an electric power station, a part of an electric grid or an industrial plant, to operation without relying on the external electric power transmission network to recover from a total or partial shutdown. [1] Power to restart a generating station or plant may come from an on-site black start standby ...
A resistive load bank, therefore, removes energy from the complete system: load bank from generator—generator from prime mover—prime mover from fuel. Additional energy is removed as a consequence of resistive load bank operation: waste heat from coolant, exhaust and generator losses and energy consumed by accessory devices. A resistive load ...
The plant is Missouri's only nuclear power plant and is close to Fulton, Missouri. [2] The 2,767 acres (1,120 ha) site began operations on December 19, 1984. It generates electricity from one 1,190-megawatt Westinghouse four-loop pressurized water reactor and a General Electric turbine-generator.
The Westinghouse Combustion Turbine Systems Division (CTSD), part of Westinghouse Electric Corporation's [1] Westinghouse Power Generation [2] group, was originally located, along with the Steam Turbine Division (STD), in a major industrial manufacturing complex, referred to as the South Philadelphia Works, in Lester, Pennsylvania near to the Philadelphia International Airport.
The bearings have to be leak-tight. A hermetic seal, usually a liquid seal, is employed; a turbine oil at pressure higher than the hydrogen inside is typically used. A metal, e.g. brass, ring is pressed by springs onto the generator shaft, the oil is forced under pressure between the ring and the shaft; part of the oil flows into the hydrogen side of the generator, another part to the air side.