Search results
Results from the WOW.Com Content Network
The minimum railway curve radius is the shortest allowable design radius for the centerline of railway tracks under a particular set of conditions. It has an important bearing on construction costs and operating costs and, in combination with superelevation (difference in elevation of the two rails) in the case of train tracks , determines the ...
In 1895, the Railway Signaling Club was organized at a meeting in Chicago, Illinois, and created a code of rules governing the operation of interlockings. In 1919, the Signaling Club became the Signal Division of the newly created American Railway Association (ARA) and the Telegraph Superintendents became its Telegraph and Telephone Section.
In civil engineering, clearance refers to the difference between the loading gauge and the structure gauge in the case of railroad cars or trams, or the difference between the size of any vehicle and the width/height of doors, the width/height of an overpass or the diameter of a tunnel as well as the air draft under a bridge, the width of a lock or diameter of a tunnel in the case of watercraft.
For example, North America uses the reference rail as the line rail which is the east rail of tangent track running north and south, the north rail of tangent track running east and west, the outer rail (the rail that is further away from the center) on curves, or the outside rails in multiple track territory. [6]
The code also defines the clearance that is shorter than the physical clearance to account for sag curves, bridge deflection and expected settlements with a recommendation of minimum clearance of 5 metres (16 ft 5 in). [2] In UK, the "standard minimum clearance" for structures over public highways is 16 feet 6 inches (5.03 m). [3]
Measurement of track spacing from the rail head to rail head. By definition, the track spacing is given from centre to centre of a rail track. For an actual construction the distance is measured from the inside of a rail head to the matching one of the other track. As far as both tracks have the same gauge this is the same distance.
The Iron Ore Line north of Kiruna was the first electrified railway line in Sweden and has limited height clearance (SE-B) because of snow shelters. On the rest of the network belonging to the Swedish Transport Administration ( Trafikverket ), the structure gauge accepts cars built to SE-A and thus accepts both cars built to UIC GA and GB.
In Canada, a Clearance is the equivalent to a Track Warrant. Direct Traffic Control Direct Traffic Control, or DTC, is similar to TWC, except that the rail line is divided up into predefined blocks—somewhat similar to ABS blocks without the signals—and dispatchers authorize trains to proceed in a specified number of blocks. Only one train ...