Search results
Results from the WOW.Com Content Network
The cafés had a snack bar in the middle of the car and 53 coach seats; the dinettes had eight booths and 23 coach seats. [58] Each café car weighs about 110,000 pounds (50,000 kg). [5] The Amcafe design was unpopular and Amtrak rebuilt the cafés into numerous configurations during the 1980s and 1990s. [61]
The 72 standard coaches could seat between 76 and 82 passengers depending on the seating configuration and 14 accessible coaches could seat 72 and included space for a wheelchair. [2] The entire coach fleet was later rebuilt to be accessible, with cars now seating between 68 and 72 passengers depending on the seating configuration.
6 coach/baggage cars were built for Amtrak California and all are named after bays. [8] The layout of upper level of the coach/baggage cars is identical to the coach cars with 76 seats, 6 tables and 2 club seating areas. The lower level has 7 seats, one wheelchair position, [9] one restroom and a locked compartment used to store checked baggage ...
A train seat design has a seat base height, seating angle, seat depth (the distance from the front edge of the seat to the back of the seat), seat hardness and seat width that can support the sitting position of average passengers.
The Empire Builder became the first long-distance train to use Superliners, and the first train permanently assigned them, on October 28, 1979. [20] Amtrak's new national timetable depicted a Superliner coach on the front cover, and the listing for the Empire Builder carried a heading which read "Amtrak's Superliner is Somethin' Special."
90 passengers (coach cars) Operators: Amtrak & Caltrans as Amtrak California: Depots: Los Angeles, Oakland: Lines served: Pacific Surfliner, Capitol Corridor, San Joaquin: Specifications; Car length: 85 ft 0 in (25.91 m) Width: 10 ft 2 in (3.10 m) Height: 16 ft 2 in (4.93 m) Entry: Step: Doors: 2 sets of bi-parting automatic doors per side ...
Amtrak's original contract was for the delivery of 20 sets (6 coaches each, with power cars at front and rear) for $800 million. [11] By 2004, Amtrak had settled contract disputes with the consortium, paying a total of $1.2 billion for the 20 sets, plus 15 extra electric locomotives , and the construction of maintenance facilities in Boston ...
In 2006, Amtrak received just under $1.4 billion, with the condition that Amtrak would reduce (but not eliminate) food and sleeper service losses. Thus, dining service was simplified and now requires two fewer on-board service workers. Only Auto Train and Empire Builder services continue regular made-on-board meal service. In 2010 the Senate ...