In August, the Idaho State Board of Education unanimously approved a ground lease between Home Depot and the University of Idaho to build a 138,000-square-foot store and garden center on UI land ...
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
The old Britannia Bridge with train track inside the box-girder tunnel Section of the original tubular Britannia Bridge The patent curved and tapered box girder jib of a Fairbairn steam crane. A box girder or tubular girder (or box beam) is a girder that forms an enclosed tube with multiple walls, as opposed to an Ɪ-or H-beam.
Concrete used for canal lining is typically non-reinforced, as a way to reduce cost. A common method for constructing concrete lining is the use of slip forms, which are drawn down the length of the canal as the concrete is poured. [3] Hand laying of concrete or prefabricated sections are also used when only a short distance needs to be covered ...
Anchor channels, invented by Anders Jordahl in 1913, are steel channels cast flush in reinforced concrete elements to allow the installation of channel bolts for the fastening of components. Anchor channels consist of steel C-shaped channels and anchors (mostly headed studs ) which are connected to the channel by welding or riveting/forging.
Using this term, one can calculate many things in the same way as for a round tube. When the cross-section is uniform along the tube or channel length, it is defined as [1] [2] =, where A is the cross-sectional area of the flow, P is the wetted perimeter of the cross-section.
John Hancock Center in Chicago, designed in 1965 and finished in 1969, is an example of the trussed tube structural design. In structural engineering, the tube is a system where, to resist lateral loads (wind, seismic, impact), a building is designed to act like a hollow cylinder, cantilevered perpendicular to the ground.
For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...