Search results
Results from the WOW.Com Content Network
Originally assigned Project 2. [1] 2 Guard Ship: Uragan-class: 1926 633 8 Uragan-class Series I. Originally assigned Project 1 but poor test results led to its number being swapped with the Leningrad-class. [2] 3 Minesweeper: Fugas-class: 1930 Fugas-class Series I. 4 Guard Ship Uragan-class 1931 619 4 Uragan-class Series II. [2] 5 Cargo Lighter ...
The belt armor was carried forward of the magazines at a thickness of 220 mm (8.7 in) and terminated in a steeply sloped (30°) transverse 285 mm (11.2 in) bulkhead that reduced to 250 mm (9.8 in) at the lower deck where it was continued down to the inner bottom by a 75-millimeter (3 in) bulkhead.
The armor of the Project 26 ships was vulnerable even to destroyer-class weapons at ranges under 10 km (6.2 mi) and the last four ships were given additional armor. The belt, traverse bulkheads, barbettes and turret face thicknesses were all increased to 70 mm (2.8 in) and the box protecting the steering gear was increased to 30 mm (1.2 in).
Sketchfab is a 3D asset website used to publish, share, discover, buy and sell 3D, VR and AR content. It provides a viewer based on the WebGL and WebXR technologies that allows users to display 3D models on the web, to be viewed on any mobile browser, desktop browser or Virtual Reality headset.
The riveted hull was subdivided by 24 transverse bulkheads and used longitudinal framing in the citadel, but transverse framing for the structure fore and aft of the citadel. The metacentric height was 2.8 meters (9 ft 2 in) for the 305 mm gunned ships, but dropped to 2.58 meters (8 ft 6 in) in the 380 mm gunned ships. The tactical diameter was ...
In the late 1970s, the Soviets realised the need for a larger, more seaworthy craft with better gun armament and higher positioned air search radars.In the Tarantul class, both the single 76 mm (3.0 in) main gun and the two 30 mm (1.2 in) Gatling-type guns are used for air defence, together with a comprehensive electronic warfare suite.
To speed up production, it was decided to build an improved version of the pre-war Chapayev-class cruiser (Project 68), the Sverdlov (Project 68B) instead of a wholly new design (Project 65). The design for the Sverdlov class was formally approved on 27 May 1947.
A Soviet 'fleet recognition manual' planted in the West seemed to confirm the existence and general features of the K-1000 Heavy Fleet Unit Sovetskaya Byelorussia, and that she was in commission from 10 November 1953. The accompanying drawings, showing two missile domes, six heavy guns and a cluster of lighter armament, gave a further veneer of ...