Search results
Results from the WOW.Com Content Network
The valve at the top is called the swab valve and lies in the path used for well interventions like wireline and coiled tubing. For such operations, a lubricator is rigged up onto the top of the tree and the wire or coil is lowered through the lubricator, past the swab valve and into the well. This valve is typically manually operated.
Well intervention vessel Skandi Constructor. A well intervention, or well work, is any operation carried out on an oil or gas well during, or at the end of, its productive life that alters the state of the well or well geometry, provides well diagnostics, or manages the production of the well.
In the context of oil wells, pumping is a routine operation involving injecting fluids into the well. Pumping may either be done by rigging up to the kill wing valve on the Xmas tree or, if an intervention rig up is present pumping into the riser through a T-piece (a small section of riser with a connection on the side).
Within the tubing you can mount a combination of tools that will help to control fluid flow through the tubing. Gas lift well: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is lowered and the fluid is gas lifted to the surface. Single-well alternate completions: in this instance there is a well with two ...
In the diagram, these are stands of drill pipe which are 2 or 3 joints of drill pipe connected and stood in the derrick vertically, usually to save time while tripping pipe. Drill string (#25) is an assembled collection of drill pipe, heavy weight drill pipe, drill collars and any of a whole assortment of tools, connected and run into the ...
When the well has been drilled, it is completed to provide an interface with the reservoir rock and a tubular conduit for the well fluids. The surface pressure control is provided by a Christmas tree, which is installed on top of the wellhead, with isolation valves and choke equipment to control the flow of well fluids during production.
Secondary oil well control is done after the Primary oil well control has failed to prevent formation fluids from entering the wellbore. This process uses "blow out preventer", a BOP, to prevent the escape of wellbore fluids from the well. As the rams and choke of the BOP remain closed, a pressure built up test is carried out and a kill mud ...
This means that they are installed as a component of the completion string and run in during completion. Retrieving the valve, should it malfunction, requires a workover. The full name for this most common type of downhole safety valve is a Tubing Retrievable Surface Controlled Sub-Surface Valve, shortened in completion diagrams to TRSCSSV.