enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. [ 1 ] [ 2 ] During testing, adjustment, calibration, or verification procedures, a load bank is connected to the output of a power source, such as an electric generator ...

  3. Power steering - Wikipedia

    en.wikipedia.org/wiki/Power_steering

    Power steering is a system for reducing a driver's effort to turn a steering wheel of a motor vehicle, by using a power source to assist steering. [1]Hydraulic or electric actuators add controlled energy to the steering mechanism, so the driver can provide less effort to turn the steered wheels when driving at typical speeds, and considerably reduce the physical effort necessary to turn the ...

  4. Automatic generation control - Wikipedia

    en.wikipedia.org/wiki/Automatic_generation_control

    In an electric power system, automatic generation control (AGC) is a system for adjusting the power output of multiple generators at different power plants, in response to changes in the load. Since a power grid requires that generation and load closely balance moment by moment, frequent adjustments to the output of generators are necessary.

  5. Capability curve - Wikipedia

    en.wikipedia.org/wiki/Capability_curve

    The fixed speed wind turbines without a power converter (also known as "Type 1" and "Type 2" [5]) cannot be used for voltage control. They simply absorb the reactive power (like any typical induction machine), so a switched capacitor bank is usually used to correct the power factor to unity. [7] Capability curve of a photovoltaic generator

  6. Induction generator - Wikipedia

    en.wikipedia.org/wiki/Induction_generator

    When the load current exceeds the capability of the generator to supply both magnetization reactive power and load power the generator will immediately cease to produce power. The load must be removed and the induction generator restarted with either an external DC motor or if present, residual magnetism in the core. [2]

  7. Transfer switch - Wikipedia

    en.wikipedia.org/wiki/Transfer_switch

    When utility power returns for a minimum time, the transfer switch will transfer the house back to utility power and command the generator to turn off, after another specified amount of "cool down" time with no load on the generator. A transfer switch can be set up to provide power only to critical circuits or to entire electrical (sub)panels.

  8. Load rejection - Wikipedia

    en.wikipedia.org/wiki/Load_rejection

    Load rejection in an electric power system is the condition in which there is a sudden load loss in the system which causes the generating equipment to be over-frequency.. A load rejection test is part of commissioning for power systems to confirm that the system can withstand a sudden loss of load and return to normal operating conditions using its governor. [1]

  9. Alternator (automotive) - Wikipedia

    en.wikipedia.org/wiki/Alternator_(automotive)

    An alternator is a type of electric generator used in modern automobiles to charge the battery and to power the electrical system when its engine is running. Until the 1960s, automobiles used DC dynamo generators with commutators. As silicon-diode rectifiers became widely available and affordable, the alternator gradually replaced the dynamo.