Ads
related to: flanged post for concrete wall installation
Search results
Results from the WOW.Com Content Network
Diagram of double tee beam. A double tee or double-T beam is a load-bearing structure that resembles two T-beams connected to each other side by side. The strong bond of the flange (horizontal section) and the two webs (vertical members, also known as stems) creates a structure that is capable of withstanding high loads while having a long span.
Unlike an I-beam, a T-beam lacks a bottom flange, which carries savings in terms of materials, but at the loss of resistance to tensile forces. [5] T- beam designs come in many sizes, lengths and widths to suit where they are to be used (eg highway bridge, underground parking garage) and how they have to resist the tension, compression and shear stresses associated with beam bending in their ...
Wall cladding fastened to the girt, or a discrete bracing system which includes the girt, can provide shear resistance, in the plane of the wall, along the length of the primary member. Since the girts are normally fastened to, or near, the exterior flange of a column, stability braces may be installed at a girt to resist rotation of the ...
The structural channel, C-channel or parallel flange channel (PFC), is a type of (usually structural steel) beam, used primarily in building construction and civil engineering. Its cross section consists of a wide "web", usually but not always oriented vertically, and two "flanges" at the top and bottom of the web, only sticking out on one side ...
A box girder or tubular girder (or box beam) is a girder that forms an enclosed tube with multiple walls, as opposed to an Ɪ-or H-beam. Originally constructed of wrought iron joined by riveting , they are now made of rolled or welded steel, aluminium extrusions or prestressed concrete .
A hold-down may also refer to clamping device used to anchor a pipe to a structural steel element or concrete floor or allow movement of the pipe in an axial direction. [1] At the bottom, the hold down is connected to the concrete foundation or structural slab by an embedded or epoxied anchor bolt. At the top, the hold down is connected to a ...
The bridge was completed in 1967, but in 1977 and 1998, a median barrier, larger outside walls, and a thicker concrete deck were added to the bridge, causing additional loading on the already under-designed gusset plates. [4]
Intermediate – A post in an exterior wall not at a corner. Chimney – An intermediate post receiving its name from being near a chimney. Interior – A general term for posts not in an exterior wall. Arcade – A post located between an aisle and nave. [10] Aisle – same as arcade post. [11] Corner – Any post at the corner of a building.
Ads
related to: flanged post for concrete wall installation