Search results
Results from the WOW.Com Content Network
Ground loop current induced by stray AC magnetic fields (B, green) Ground loop currents can be induced by stray AC magnetic fields [5] [7] (B, green) which are always present around AC electrical wiring. The ground loop constitutes a conductive wire loop which may have a large area of several square meters.
Live testing. Earth fault loop impedance testing: this test is to check that if a fault did occur, that the system meets requirements to cause a disconnection of the supply within the time limit specified by standards Insulation resistance testing Polarity test: a test to check that the connections are connected in the right sequence
Some receptacle testers include an additional test button to test the triggering of GFCI devices, which supplements the built-in test button on the GFCI and can be used for testing outlets downstream from a GFCI receptacle. "Plug-in analyzers" may include earth loop impedance and other checks. [5]: 48–49
The resistance path is the total resistance back through the supply transformer; to measure this an engineer will use an "earth fault loop impedance meter". The application of a low voltage allows a small current to pass from the socket back through earth to the supply transformer and distribution board.
For power circuits, the color-coding uses the same colors as residential construction, and adds the additional wires used for three-phase systems. Black, Red and Blue are used for hot wires and White is used as the neutral wire in a 120/208 V circuit. Brown, Orange and Yellow are used as hot wires and gray is used as the neutral wire in a 277/ ...
The neutral conductor of a 3-phase, 4-wire system and the middle conductor of a 2- phase, 3-wire system must have at least 2 separate and distinct earth connections with a minimum of 2 different earth electrodes to have a satisfactory earth resistance; The earth electrodes must be interconnected to reduce earth resistance
Murray loop bridge. Murray loop test employs the principle of wheatstone bridge for locating the fault. To perform this test, it is necessary to have a sound cable running alongside the faulty cable. One end of the faulted cable is connected through a pair of resistors to the voltage source. Also a null detector is connected. The other end of ...
Language links are at the top of the page across from the title.