enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Drawdown (hydrology) - Wikipedia

    en.wikipedia.org/wiki/Drawdown_(hydrology)

    In subsurface hydrogeology, drawdown is the reduction in hydraulic head observed at a well in an aquifer, typically due to pumping a well as part of an aquifer test or well test. In surface water hydrology and civil engineering , drawdown refers to the lowering of the surface elevation of a body of water, the water table, the piezometric ...

  3. Oil well control - Wikipedia

    en.wikipedia.org/wiki/Oil_well_control

    Pump pressure, which is also referred to as system pressure loss, is the sum total of all the pressure losses from the oil well surface equipment, the drill pipe, the drill collar, the drill bit, and annular friction losses around the drill collar and drill pipe. It measures the system pressure loss at the start of the circulating system and ...

  4. Well control - Wikipedia

    en.wikipedia.org/wiki/Well_control

    Well control is the technique used in oil and gas operations such as drilling, well workover and well completion for maintaining the hydrostatic pressure and formation pressure to prevent the influx of formation fluids into the wellbore.

  5. Well test - Wikipedia

    en.wikipedia.org/wiki/Well_test

    Often the well efficiency is determined from this sort of test, this is a percentage indicating the fraction of total observed drawdown in a pumping well which is due to aquifer losses (as opposed to being due to flow through the well screen and inside the borehole). A perfectly efficient well, with perfect well screen and where the water flows ...

  6. Drill stem test - Wikipedia

    en.wikipedia.org/wiki/Drill_stem_test

    A drill stem test (DST) is a procedure for isolating and testing the pressure, permeability and productive capacity of a geological formation during the drilling of a well. The test is an important measurement of pressure behaviour at the drill stem and is a valuable way of obtaining information on the formation fluid and establishing whether a ...

  7. List of abbreviations in oil and gas exploration and production

    en.wikipedia.org/wiki/List_of_abbreviations_in...

    WOC – water/oil contact (or oil/water contact) WOE – well operations engineer (a key person of well services [citation needed]) WOM – wait/waiting on material; WOR – water-oil ratio; WORKO – workover; WOS – west of Shetland, oil province on the UKCS; WOW – wait/waiting on weather; WP – well proposal or working pressure

  8. Pore pressure gradient - Wikipedia

    en.wikipedia.org/wiki/Pore_pressure_gradient

    Using the figures above, we can calculate the maximum pressure at various depths in an offshore oil well. Saltwater is 0.444 psi/ft (2.5% higher than fresh water but this not general and depends on salt concentration in water) Pore pressure in the rock could be as high as 1.0 psi/ft of depth (19.25 lb/gal)

  9. Pressure tank - Wikipedia

    en.wikipedia.org/wiki/Pressure_tank

    Case 2 is a tank in use, with the air pressure at pressure P (gauge) and a water volume of V. Referring to the diagram on the right, a pressure tank is generally pressurized when empty with a "charging pressure" P c, which is usually about 2 psi below the turn-on pressure P lo (Case 1). The total volume of the tank is V t.