Ads
related to: concrete floor primer before epoxy coating
Search results
Results from the WOW.Com Content Network
Epoxy moisture control systems can be applied over concrete with relative humidity levels up to 100%, and there are systems available on the market today that can be applied over concrete that is physically damp. In some cases, with the use of an epoxy moisture control system, floor coverings can be installed just 7 days after the slab is poured.
They require a dry, clean surface during application to gain adhesion. Topical sealers may alter the coefficient of friction which can make substrates slick when wet – a condition that can be remedied by adding anti-skid materials. Life span is generally 1-5 years, although high-end epoxy/urethane systems can last significantly longer.
Integral damp proofing in concrete involves adding materials to the concrete mix to make the concrete itself impermeable. [ 4 ] Surface suppressant coating with thin water proof materials such as epoxy resin for resistance to non-pressurized moisture such as rain water or a coating of cement sprayed on such as shotcrete which can resist water ...
Epoxy is the family of basic components or cured end products of epoxy resins. Epoxy resins, also known as polyepoxides, are a class of reactive prepolymers and polymers which contain epoxide groups. The epoxide functional group is also collectively called epoxy. [1] The IUPAC name for an epoxide group is an oxirane.
A coating is a covering that is applied to the surface of an object, or substrate. [1] The purpose of applying the coating may be decorative, functional, or both. [2] Coatings may be applied as liquids, gases or solids e.g. powder coatings.
Masonry walls are built with a damp-proof course to prevent rising damp, and the concrete in foundations needs to be damp-proofed or waterproofed with a liquid coating, basement waterproofing membrane (even under the concrete slab floor where polyethylene sheeting is commonly used), or an additive to the concrete.
Ads
related to: concrete floor primer before epoxy coating