Search results
Results from the WOW.Com Content Network
However, due to construction delays, the opening was pushed to June 2023, then to April 2024. The civil work for the line finished in March 2024 and BMRCL announced for the line to be opened in July 2024, but the opening was pushed again to November 2024 and then to December 2024, due to a delay in the delivery of rolling stock.
Bommanahalli (also known as Roopena Agrahara) is an upcoming elevated metro station on the North–South corridor of the Yellow Line of Namma Metro in Bangalore, India.. As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025 [1] due to lack of train sets which are needed for commencement of commercial operations.
Out of the operational 68 metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. [2] [3] Evolution of Namma Metro. The first section (on the Purple Line) of the Namma Metro system opened on 20 October 2011 between Baiyappanahalli and M.G Road. The system is ...
The BMRCL charges ₹ 50,000 (US$600) for shooting inside a metro station, and ₹ 40,000 (US$480) for shoots inside a metro train during peak hours between 6 am to 10 pm. During non-peak hours, from 10 pm to 4 am, the agency charges ₹ 50,000 (US$600) for shoots inside metro stations and ₹ 20,000 (US$240) inside a train.
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Bommasandra metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro.
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Electronic City metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro.
Kudlu Gate is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India. As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025 [ 1 ] due to lack of trainsets which are needed for commencement of commercial operations.
The total roofing area of the 10 stations on the stretch was 47,000 square metres (510,000 sq ft). [24] [25] The first section of Green Line was opened to public on 1 March 2014. [26] BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers traveled on the line on the opening day. [27]