Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000 MW Stage 1 was dedicated to nation by Prime ...
Solapur Super Thermal Power Station is under construction located at Fatatewadi and Aherwadi village in Solapur district in Indian state of Maharashtra.The power plant is one of the coal based power plants of National Thermal Power Corporation Limited (NTPCL).
NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
The plant stopped production in 2001 when the government could not pay for its electricity costs. In 2002, Enron became bankrupt. [4] In 2005, the plant was taken over by the Government of Maharashtra. [5] The company was established on 8 July 2005, with GAIL and NTPC each holding just over 25.51% of its equity
The plant operates 4 units and has a total power generation capacity of 2190 MW. [1] A proposed 440 kilovolt high power transmission line from Koradi to Bhusawal would join Nagpur with Mumbai. [5] KTPS campus also contains training institute of MahaGenco for middle and senior level engineers, technicians and other staff. [6]
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
Nashik Thermal Power Station has an installed capacity of 140*2+210*3=910 MW. The first unit was commissioned in 1970. the cost of unit including civil works was Rs 56.5 crores. and the second unit also commissioned with the same cost under the first stage. the second stage consists of three units of 210 MW each was commissioned in the later years.
Chutka Nuclear Power Plant in Madhya Pradesh: IPHWR-700: 1400 (2 × 700 MW) Joint Venture agreement signed between NPCIL and NTPC in May 2023 for the construction of the indigenously built nuclear reactor. Construction to start by mid - 2024 and is anticipated to complete within 4-5 years. [15] Bhimpur, Shivpuri in Madhya Pradesh: 2800 (4 × ...