Cross slope, cross fall or camber is a geometric feature of pavement surfaces: the transverse slope with respect to the horizon. It is a very important safety factor. Cross slope is provided to provide a drainage gradient so that water will run off the surface to a drainage system such as a street gutter or ditch.
Embankment dams come in two types: the earth-filled dam (also called an earthen dam or terrain dam) made of compacted earth, and the rock-filled dam. A cross-section of an embankment dam shows a shape like a bank, or hill. Most have a central section or core composed of an impermeable material to stop water from seeping through the dam.
Graham's 1999 study [65] of US dam failures resulting in fatalities from 1960 to 1998 concluded that the failure of dams between 6.1 and 15 m high (typical height range of smaller dams [66]) caused 86% of the deaths, and the failure of dams less than 6.1 m high caused 2% of the deaths.
The alignment is the route of the road, defined as a series of horizontal tangents and curves. The profile is the vertical aspect of the road, including crest and sag curves, and the straight grade lines connecting them. The cross section shows the position and number of vehicle and bicycle lanes and sidewalks, along with their cross slope or ...
In civil engineering, cant is often referred to as cross slope or camber. It helps rainwater drain from the road surface. Along straight or gently curved sections, the middle of the road is normally higher than the edges. This is called "normal crown" and helps shed rainwater off the sides of the road. During road works that involve lengths of ...
A causeway is a track, road or railway on the upper point of an embankment across "a low, or wet place, or piece of water". [1] It can be constructed of earth, masonry , wood, or concrete. One of the earliest known wooden causeways is the Sweet Track in the Somerset Levels , England, which dates from the Neolithic age. [ 2 ]
Layers in the construction of a mortarless pavement: A.) Subgrade B.) Subbase C.) Base course D.) Paver base E.) Pavers F.) Fine-grained sand Section through railway track and foundation showing the sub-grade. In transport engineering, subgrade is the native material underneath a constructed road, [1] pavement or railway track (US: railroad
The 6 kilometres (3.7 mi) long, 55 metres (180 ft) high earthfill embankment dam with composite masonry cum concrete spillway and under-sluice structures, concrete diaphragm cut-off wall, rock excavation in foundation, diversion channel, coffer dam and appurtenant works at Tenughat was built for supply of water to Bokaro Steel Plant and the Bokaro industrial area.