Search results
Results from the WOW.Com Content Network
National Capital Power Station (NCPS) or NTPC Dadri is the power project to meet the power demand of National Capital Region (India). It has a huge coal-fired thermal power plant and a gas-fired plant and has a small township located in Uttar Pradesh , India for its employees.
The 5 MW power plant is the first solar project of NTPC Limited, which was commissioned in 2013 on 27 acres of land at the NTPC Dadri Thermal Power Station. [1] The whole project was executed for about ₹48.59 crore by Wipro Limited. [2]
In 1998, it commissioned its first Naptha-based plant at Kayamkulam with a capacity of 350 MW. In 1999, its plant in Dadri, which had the highest plant load factor (PLF) in India of 96%, was certified with ISO-14001. During 2000, it started construction of its first hydro-electric power project, with 800 MW capacity, in Himachal Pradesh.
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
Singrauli Super Thermal Power Plant is located at Shaktinagar in Sonebhadra district in Indian state of Uttar Pradesh. [1] The power plant is the first power plant of NTPC . [ 2 ] [ 3 ] It sources coal from Jayant and Bina mines and water from Rihand Reservoir.
This logo image consists only of simple geometric shapes or text. It does not meet the threshold of originality needed for copyright protection, and is therefore in the public domain . Although it is free of copyright restrictions, this image may still be subject to other restrictions .
The power plant is one of the coal-based power plants of NTPC. The coal for the power plant is sourced from Lingraj Block & Kaniha coal block of Mahanadi Coalfields Ltd. Source of water for the power plant is from Samal Barrage Reservoir on Brahmani River. The plant supplies power to Indian states of Odisha, Andhra Pradesh, Karnataka
Kudgi Super Thermal Power Project will have an installed capacity of 4000 MW (3x800 MW in first stage and 2x800 MW in second stage). Doosan Power systems India Pvt Ltd will supply Steam Generator for the plant & Toshiba JSW Power Systems Pvt Ltd will supply super-critical steam turbine and generator and L&T Howden will supply Axial fans to NTPC for the plant. [2]