Search results
Results from the WOW.Com Content Network
Wood handbook—wood as an engineering material. General Technical Report FPL-GTR-282. Madison, WI: U.S. Department of Agriculture, Forest Service, Forest Products Laboratory.
The [main] field of the drawing, as opposed to other areas of it, such as the parts list , general notes (G/N), flagnotes , title block , rev block , bill of materials (B/M or BoM or BOM), or list of materials . Rationales for drawing changes that are noted in the rev block often use these abbreviations for brevity (e.g., "DIM 14.00 was 12.50 ...
An engineering bill of materials (EBOM) is a type of bill of materials (BOM) reflecting the product as designed by engineering.. The EBOM is not related to modular BOM or configurable BOM (CBOM) concepts, as modular and configurable BOMs are used to reflect selection of items to create saleable end-products.
The product data submittal usually consists of the manufacturer's product information. The information included in this submittal are: Manufacturer, trade name, model or type number and quantities: This information is necessary to compare the submitted item with the specified products and acceptable products listed, in the specification and addenda.
Flagnotes or flag notes (FL, F/N) are notes that apply only where a flagged callout points, such as to particular surfaces, features, or part numbers. Typically the callout includes a flag icon. Some companies call such notes "delta notes", and the note number is enclosed inside a triangular symbol (similar to capital letter delta , Δ).
Concrete is used extremely widely in building and civil engineering structures, due to its low cost, flexibility, durability, and high strength. It also has high resistance to fire. Concrete is a non-linear, non-elastic and brittle material. It is strong in compression and very weak in tension. It behaves non-linearly at all times.
A material take off (MTO) is the process of analyzing the drawings and determining all the materials required to accomplish the design. Thereafter, the material take off is used to create a bill of materials (BOM). Procurement and requisition are activities that occur after the bill of materials is complete, distinct from Inspection.
A material property is an intensive property of a material, i.e., a physical property or chemical property that does not depend on the amount of the material. These quantitative properties may be used as a metric by which the benefits of one material versus another can be compared, thereby aiding in materials selection.