enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Critical chain project management - Wikipedia

    en.wikipedia.org/wiki/Critical_chain_project...

    A fever chart or similar graph can be created and posted to show the consumption of buffer as a function of project completion. If the rate of buffer consumption is low, the project is on target. If the rate of consumption is such that there is likely to be little or no buffer at the end of the project, then corrective actions or recovery plans ...

  3. Buffer solution - Wikipedia

    en.wikipedia.org/wiki/Buffer_solution

    Buffer capacity falls to 33% of the maximum value at pH = pK a ± 1, to 10% at pH = pK a ± 1.5 and to 1% at pH = pK a ± 2. For this reason the most useful range is approximately p K a ± 1. When choosing a buffer for use at a specific pH, it should have a p K a value as close as possible to that pH.

  4. Linear scheduling method - Wikipedia

    en.wikipedia.org/wiki/Linear_scheduling_method

    LSM is used mainly in the construction industry to schedule resources in repetitive activities commonly found in highway, pipeline, high-rise building and rail construction projects. These projects are called repetitive or linear projects.

  5. Acid neutralizing capacity - Wikipedia

    en.wikipedia.org/wiki/Acid_neutralizing_capacity

    Acid-neutralizing capacity or ANC in short is a measure for the overall buffering capacity against acidification of a solution, e.g. surface water or soil water.. ANC is defined as the difference between cations of strong bases and anions of strong acids (see below), or dynamically as the amount of acid needed to change the pH value from the sample's value to a chosen different value. [1]

  6. Slip forming - Wikipedia

    en.wikipedia.org/wiki/Slip_forming

    The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.

  7. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    Anchor capacity for site lift F/n = 23 kN per anchor during site lifting (n = 2 lifting anchors) Reference to the load capacity tables provided by the anchor manufacturer is required to make an anchor selection for the specific concrete strengths at the time of lifting. Hence the great of the two calculated anchor capacities required at the ...

  8. Building material - Wikipedia

    en.wikipedia.org/wiki/Building_material

    When used in the generic sense, this is the material referred to by the term "concrete". For a concrete construction of any size, as concrete has a rather low tensile strength, it is generally strengthened using steel rods or bars (known as rebars). This strengthened concrete is then referred to as reinforced concrete. In order to minimise any ...

  9. BS 5400 - Wikipedia

    en.wikipedia.org/wiki/BS_5400

    BS 5400-1:1988 Steel, concrete and composite bridges. General statement. BS 5400-2:2006 Steel, concrete and composite bridges. Specification for loads. BS 5400-3:2000 Steel, concrete and composite bridges. Code of practice for design of steel bridges. (This part of standard is being partially replaced) BS 5400-4:1990 Steel, concrete and ...