Search results
Results from the WOW.Com Content Network
A bight is a slack part in the middle of a rope, usually a curve or loop. [1] [2] Knots that can be tied without access to either end of the rope are called knots in the bight. To tie a knot with a bight is to double up the rope into a bight and then tie the knot using the double rope.
However, the rope and knotting expert Geoffrey Budworth warns against the practice of fusing thus: [2] Sealing rope ends this way is lazy and dangerous. A tugboat operator once sliced the palm of his hand open down to the sinews after the hardened (and obviously sharp) end of a rope that had been heat-sealed pulled through his grasp. There is ...
Knot board [] on Elbe 1 (ship, 1965). A knot is an intentional complication in cordage [1] which may be practical or decorative, or both. Practical knots are classified by function, including hitches, bends, loop knots, and splices: a hitch fastens a rope to another object; a bend fastens two ends of a rope to each another; a loop knot is any knot creating a loop; and splice denotes any multi ...
Chain splice – Attached the working end of a rope to a chain. [7] Figure-eight "splice" knot – A splice-like bend knot used for joining two ropes. Horseshoe splice – A cut splice where the two sides of the loop are of unequal length. Long splice – A splice used to join two rope ends forming one rope the length of the total of the two ropes.
Half hitch – simple overhand knot, where the working end of a line is brought over and under the standing part; Half-Windsor knot – knot used for tying neckties; Halter hitch – connects a rope to an object; Halyard bend – a way to attach the end of a rope at right angle to a cylindrical object; Hammock hitch
A secure, jam-proof hitch used to tie one rope to another, or a rope to a pole, boom, spar, etc., when the pull is lengthwise along the object. Ground-line hitch: A type of knot used to attach a rope to an object. Half hitch: A simple overhand knot, where the working end of a line is brought over and under the standing part. Halter hitch
The working end of a rope is prepared by tying a figure-eight loop, and then clipping a carabiner through that loop. The rope is then wrapped around a smooth pole, pipe, round beam or tree branch which has a diameter greater than the rope. The rope is typically wrapped 3 to 4 times around the anchor, without crossing.
Begin by forming a clockwise loop around the pole, with the working end of the rope on top. Bring the working end through the loop. At this point, you have an overhand knot around the pole. Bring the working end down and to the left. Loop it under the standing end. Pull the working end through the loop just formed, tighten, and slide the knot ...