Search results
Results from the WOW.Com Content Network
It runs daily. It operates as train number 12309 from Rajendra Nagar (Patna) to New Delhi railway station and as train number 12310 in the reverse direction. It covers a distance of 1001 km in each direction, however it takes 12 hours 5 minutes when operating as train number 12310 at an average speed of 83 km/h (including halts).
12393 Sampoorna Kranti SF Express Daily departs Rajendra Nagar at 07.25 PM in the evening IST and arrives New Delhi at 07.55 AM in the morning IST. It takes 12 hours 30 mins. 12394 Sampoorna Kranti SF Express departs New Delhi every day at 05.30 PM IST and arrives Rajendra Nagar at 07.20 AM IST. It takes 13 hours 50 mins.
As of December 2024, IndiGo flies to a total of 123 destinations, including 89 domestic destinations within India and 34 international destinations within the extended neighbourhood in Asia, Africa and Europe. The list includes the city, country and the airport's name, with the airline's hubs marked.
Name of Road from to Distance in km; 1 DND Flyway: New Delhi: Noida: 6.0 2 Noida–Greater Noida Expressway: Noida: Greater Noida: 24.5 3 Yamuna Expressway: Greater Noida: Agra: 165.5 4 Agra Ring Road Kuberpur Hingot Kheria ~10 5 Agra–Lucknow Expressway: Agra: Lucknow: 302.2 6 Lucknow Ring Road: Sarosa Bharosa Chand Saray 40 7
The Patna - Gomti Nagar (Lucknow) Vande Bharat Express operates 6 days a week, covering a distance of 545 km (339 mi) in a travel time of 08 hrs 25 mins with average speed of 65 km/h. The Maximum Permissible Speed (MPS) is 130 km/h (81 mph)
This highway connects Mithapur in Patna with Bihta, Arrah and Buxar. [ 1 ] [ 2 ] The eastern end of the Purvanchal Expressway at Haydaria in Ghazipur district is around 17 km from Buxar on NH-922. Route
The AAI has planned to develop a civil enclave at the Bihta Air Force Station, 20 km (12 mi) away from Patna, to cater larger aircraft. In October 2016, The Cabinet of Bihar approved the Patna Master Plan, which envisages development of a new passenger terminal at Bihta.
The train was first introduced between Patna Junction (PNBE) and New Delhi (NDLS) on 2 October 1991 (Gandhi Jayanti). Later Nalanda Express run in between Rajgir (RGD) and New Delhi (NDLS), which use to attach/detach with Shramjeevi Express at Patna Junction. Now whole rake runs between Rajgir (RGD) and New Delhi (NDLS), as Shramjeevi Express.