Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Suspended slab under construction, with the formwork still in place Suspended slab formwork and rebar in place, ready for concrete pour. A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most ...
Installation information will need to be reviewed with electrical and plumbing trades to coordinate third-party service connections. A shop drawing is a drawing or set of drawings produced by the contractor , supplier , manufacturer, subcontractor , consultants, or fabricator .
Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete. Though it is a cost-effective technique with a shorter completion time, [ 1 ] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.
Rebar detailing is the discipline of preparing 'shop/placing' or 'fabrication' drawings or shop drawings of steel reinforcement for construction. Engineers prepare 'design drawings' that develop required strengths by applying rebar size, spacing, location, and lap of steel .
Pre-tensioned concrete is a variant of prestressed concrete where the tendons are tensioned prior to the concrete being cast. [1]: 25 The concrete bonds to the tendons as it cures, following which the end-anchoring of the tendons is released, and the tendon tension forces are transferred to the concrete as compression by static friction.
Reinforced concrete, also called ferroconcrete, is a composite material in which concrete's relatively low tensile strength and ductility are compensated for by the inclusion of reinforcement having higher tensile strength or ductility.
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.