Search results
Results from the WOW.Com Content Network
A large number of Indian Standard (IS) codes are available that are meant for virtually every aspect of civil engineering one can think of. During one's professional life one normally uses only a handful of them depending on the nature of work they are involved in. Civil engineers engaged in construction activities of large projects usually have to refer to a good number of IS codes as such ...
The Kothari River rises from the Aravalli hills near Devgarh in the Rajsamand district. [1] It flows through the tehsils (districts) of Raipur , Mandal , Bhilwara and Kotri and ultimately joins the river Banas at Nandrai in Kotri tehsil. [ 2 ]
In 2013–14, the total area irrigated in Sagardighi CD block was 8,686 hectares, out of which 4,222 hectares were irrigated by canal water, 750 hectares with tank water, 118 hectares with river lift irrigation, 1,096 hectares by deep tube well and 2,500 hectares by other means. [33]
Department of Water Resources and Irrigation (Nepali: जलस्रोत तथा सिंचाइ विभाग) under Ministry of Energy, Water Resources and Irrigation is the authority to plan, develop, maintain, operate, manage and monitor different Irrigation Projects. [1]
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Pages for logged out editors learn more
Distribution uniformity or DU in irrigation is a measure of how uniformly water is applied to the area being watered, normally expressed as percentage, and not to be confused with efficiency. [1] The distribution uniformity is often calculated when performing an irrigation audit. The DU should not be confused with the coefficient of uniformity ...
The non-limiting water range (NLWR) represents the range of water content in the soil where limitations to plant growth (such as water potential, air-filled porosity, or soil strength) are minimal. John Letey (1985) from UC Riverside introduced the NLWR concept in an attempt to integrate several physical properties associated with plant or root ...
The old Sardar canal project in the state of Gujarat, India, was designed with an irrigation intensity of 32%, but at the upstream part the delivery was at an intensity of 42% (i.e. 131% of the design norm) and at the downstream end it was only 19% (i.e. 59% of the norm), although the project aimed at protective irrigation with equal rights for ...