Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Concrete is a mix of cement and water plus an aggregate such as sand or stone. Its compression strength means it can support heavy weights. [5] Insulating concrete forms (ICFs) cam be used for home construction. They are made by pouring concrete between rigid panels, often made out of polystyrene foam. Rebar can provide additional strength ...
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]
The concrete is then settled through vibration to prevent any voids or honeycomb effects. The forms are removed when the concrete is cured; rigging is attached and a crane tilts the panel or lifts the element into place. In circumstances when space is at a premium, concrete elements can be cast one on top of the other, or stack cast.
For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...
First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]