  1. Results from the WOW.Com Content Network
  2. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Working_load_limit

    It is usually marked on the equipment by the manufacturer. It is a calculation of the Minimum Breaking Strength (MBS) also known as Minimum Breaking Load (MBL) divided by a safety factor, usually ranging from 4 to 6 on lifting equipment. The factor can be as high as 10:1 or 10 to 1, if the equipment poses a risk to a person's life.

  3. Crane (machine) - Wikipedia

    en.wikipedia.org/wiki/Crane_(machine)

    Greco-Roman Trispastos ("Three-pulley-crane"), a simple crane type (150 kg load) A crane for lifting heavy loads was developed by the Ancient Greeks in the late 6th century BC. [7] The archaeological record shows that no later than c. 515 BC distinctive cuttings for both lifting tongs and lewis irons begin to appear on stone blocks of Greek ...

  4. Counterweight - Wikipedia

    en.wikipedia.org/wiki/Counterweight

    A simple crane. A counterweight is a weight that, by applying an opposite force, provides balance and stability of a mechanical system. [1] The purpose of a counterweight is to make lifting the load faster and more efficient, which saves energy and causes less wear and tear on the lifting machine.

  5. Factor of safety - Wikipedia

    en.wikipedia.org/wiki/Factor_of_safety

    In engineering, a factor of safety (FoS) or safety factor (SF) expresses how much stronger a system is than it needs to be for an intended load.Safety factors are often calculated using detailed analysis because comprehensive testing is impractical on many projects, such as bridges and buildings, but the structure's ability to carry a load must be determined to a reasonable accuracy.

  6. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    Dynamic loads considered in lifting design are accounted for in two stages; suction to the casting bed on the initial lift and then the dynamic loads induced from crane vibration. These crane impact loads must be accounted for during transportation in the yard and on-site, and the coefficient increases from an overhead gantry crane through to a ...

  7. Design load - Wikipedia

    en.wikipedia.org/wiki/Design_load

    For example, a crane with a design load of 20 tons is designed to be able to lift loads that weigh 20 tons or less. However, when a failure could be catastrophic, such as a crane dropping its load or collapsing entirely, a factor of safety is necessary. As a result, the crane should lift about 2 to 5 tons at the most.

  8. Lifting Operations and Lifting Equipment Regulations 1998

    en.wikipedia.org/wiki/Lifting_Operations_and...

    The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are set of regulations created under the Health and Safety at Work etc. Act 1974 which came into force in Great Britain on 5 December 1998 [1] and replaced a number of other pieces of legislation which previously covered the use of lifting equipment.

  9. Overhead crane - Wikipedia

    en.wikipedia.org/wiki/Overhead_crane

    An overhead crane, commonly called a bridge crane, is a type of crane found in industrial environments. An overhead crane consists of two parallel rails seated on longitudinal I-beams attached to opposite steel columns by means of brackets. The traveling bridge spans the gap. A hoist, the lifting