Search results
Results from the WOW.Com Content Network
Performed after the well is cased, cased hole drill stem testing uses a retrievable production packer that is set above the zone of interest. The well is then flow tested through perforations in the casing. The two types of cased hole testing are pressure operated and mechanically operated.
Production casing is the final casing string set in a well and usually reaches from the surface to Target Depth (TD). The type of casing used depends upon the different conditions in the well. Commonly, production casing sizes range from 4 + 1 ⁄ 2 in (110 mm) to as large as 9 + 5 ⁄ 8 in (240 mm). It is the last string cemented in a well ...
Regularly, for example once a month per well, the flow from one and only one selected well is led into the test separator for determining well flow rate for the selected well. [3] The separator divides the flow from the well into the streams of individual products which typically are oil, gas and water, but may include natural-gas condensate ...
This refers to the portion of the well across the production or injection zone. The well designer has many tools and options available to design the lower completion (downhole completion) according to the conditions of the reservoir. Typically, the lower completion is set across the productive zone using a liner hanger system, which anchors the ...
Drill pipe (#16) is a joint of hollow tubing used to connect the surface equipment to the bottom hole assembly (BHA) and acts as a conduit for the drilling fluid. In the diagram, these are stands of drill pipe which are 2 or 3 joints of drill pipe connected and stood in the derrick vertically, usually to save time while tripping pipe.
Petroleum production engineering is a subset of petroleum engineering. Petroleum production engineers design and select subsurface equipment to produce oil and gas well fluids . [ 1 ] They often are degreed as petroleum engineers , although they may come from other technical disciplines (e.g., mechanical engineering , chemical engineering ...
Reservoir engineers could use the map as a part of their well drill planning. Reservoir engineering is a branch of petroleum engineering that applies scientific principles to the fluid flow through a porous medium during the development and production of oil and gas reservoirs so as to obtain a high economic recovery. The working tools of the ...
Well stimulation is a broad term used to describe the various techniques and well interventions that can be used to restore or enhance the production of hydrocarbons from an oil well. Hydraulic fracturing (fracking) and acidizing are two of the most common methods for well stimulation.