enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Drill stem test - Wikipedia

    en.wikipedia.org/wiki/Drill_stem_test

    Performed after the well is cased, cased hole drill stem testing uses a retrievable production packer that is set above the zone of interest. The well is then flow tested through perforations in the casing. The two types of cased hole testing are pressure operated and mechanically operated.

  3. Production tubing - Wikipedia

    en.wikipedia.org/wiki/Production_tubing

    Production casing is the final casing string set in a well and usually reaches from the surface to Target Depth (TD). The type of casing used depends upon the different conditions in the well. Commonly, production casing sizes range from 4 + 1 ⁄ 2 in (110 mm) to as large as 9 + 5 ⁄ 8 in (240 mm). It is the last string cemented in a well ...

  4. Well test (oil and gas) - Wikipedia

    en.wikipedia.org/wiki/Well_test_(oil_and_gas)

    Regularly, for example once a month per well, the flow from one and only one selected well is led into the test separator for determining well flow rate for the selected well. [3] The separator divides the flow from the well into the streams of individual products which typically are oil, gas and water, but may include natural-gas condensate ...

  5. Completion (oil and gas wells) - Wikipedia

    en.wikipedia.org/wiki/Completion_(oil_and_gas_wells)

    This refers to the portion of the well across the production or injection zone. The well designer has many tools and options available to design the lower completion (downhole completion) according to the conditions of the reservoir. Typically, the lower completion is set across the productive zone using a liner hanger system, which anchors the ...

  6. List of components of oil drilling rigs - Wikipedia

    en.wikipedia.org/wiki/List_of_components_of_oil...

    Drill pipe (#16) is a joint of hollow tubing used to connect the surface equipment to the bottom hole assembly (BHA) and acts as a conduit for the drilling fluid. In the diagram, these are stands of drill pipe which are 2 or 3 joints of drill pipe connected and stood in the derrick vertically, usually to save time while tripping pipe.

  7. Petroleum production engineering - Wikipedia

    en.wikipedia.org/wiki/Petroleum_production...

    Petroleum production engineering is a subset of petroleum engineering. Petroleum production engineers design and select subsurface equipment to produce oil and gas well fluids . [ 1 ] They often are degreed as petroleum engineers , although they may come from other technical disciplines (e.g., mechanical engineering , chemical engineering ...

  8. Reservoir engineering - Wikipedia

    en.wikipedia.org/wiki/Reservoir_engineering

    Reservoir engineers could use the map as a part of their well drill planning. Reservoir engineering is a branch of petroleum engineering that applies scientific principles to the fluid flow through a porous medium during the development and production of oil and gas reservoirs so as to obtain a high economic recovery. The working tools of the ...

  9. Well stimulation - Wikipedia

    en.wikipedia.org/wiki/Well_stimulation

    Well stimulation is a broad term used to describe the various techniques and well interventions that can be used to restore or enhance the production of hydrocarbons from an oil well. Hydraulic fracturing (fracking) and acidizing are two of the most common methods for well stimulation.