Search results
Results from the WOW.Com Content Network
Example of a spent fuel pool from the shut-down Caorso Nuclear Power Plant. This pool is not holding large amounts of material. Spent fuel pools (SFP) are storage pools (or "ponds" in the United Kingdom) for spent fuel from nuclear reactors. They are typically 40 or more feet (12 m) deep, with the bottom 14 feet (4.3 m) equipped with storage ...
The essential service water system (ESWS) circulates the water that cools the plant's heat exchangers and other components before dissipating the heat into the environment. Because this includes cooling the systems that remove decay heat from both the primary system and the spent fuel rod cooling ponds, the ESWS is a safety-critical system. [ 7 ]
Spent nuclear fuel, occasionally called used nuclear fuel, is nuclear fuel that has been irradiated in a nuclear reactor (usually at a nuclear power plant). It is no longer useful in sustaining a nuclear reaction in an ordinary thermal reactor and, depending on its point along the nuclear fuel cycle, it will have different isotopic constituents ...
[citation needed] The containment is the fourth and final barrier to radioactive release (part of a nuclear reactor's defence in depth strategy), the first being the fuel ceramic itself, the second being the metal fuel cladding tubes, the third being the reactor vessel and coolant system. [2]
The five criteria for ECCS are to prevent peak fuel cladding temperature from exceeding 2200 °F (1204 °C), prevent more than 17% oxidation of the fuel cladding, prevent more than 1% of the maximum theoretical hydrogen generation due the zircalloy metal-water reaction, maintain a coolable geometry, and allow for long-term cooling.
The zirconium alloy tubes are about 1 cm in diameter, and the fuel cladding gap is filled with helium gas to improve the conduction of heat from the fuel to the cladding. There are about 179-264 fuel rods per fuel bundle and about 121 to 193 fuel bundles are loaded into a reactor core. Generally, the fuel bundles consist of fuel rods bundled ...
The time required for the fuel to melt. After the water has boiled, then the time required for the fuel to reach its melting point will be dictated by the heat input due to decay of fission products, the heat capacity of the fuel and the melting point of the fuel. The time required for the molten fuel to breach the primary pressure boundary.
The fuel cladding material was a magnesium-zirconium alloy in the UNGG, as opposed to magnesium-aluminium in Magnox. As both claddings react with water, they can be stored in a spent fuel pool only for short periods of time, making short-term reprocessing of fuel essential, which requires heavily shielded facilities.