Search results
Results from the WOW.Com Content Network
Dynamic load testing (or dynamic loading) is a method to assess a pile's bearing capacity by applying a dynamic load to the pile head (a falling mass) while recording acceleration and strain on the pile head. Dynamic load testing is a high strain dynamic test which can be applied after pile installation for concrete piles. For steel or timber ...
Static load testing is an in situ type of load testing used in geotechnical investigation to determine the bearing capacity of deep foundations prior to the construction of a building. It differs from the statnamic load test and dynamic load testing in that the pressure applied to the pile is slower.
Marcus's method is a structural analysis used in the design of reinforced concrete slabs. The method was developed by Henri Marcus and described in 1938 in Die Theorie elastischer Gewebe und ihre Anwendung auf die Berechnung biegsamer Platten . [ 1 ]
The soil response for each pile segment is modeled as viscoelastic-plastic. The method was first developed in the 1950s by E.A. Smith of the Raymond Pile Driving Company. Wave equation analysis of piles has seen many improvements since the 1950s such as including a thermodynamic diesel hammer model and residual stress. Commercial software ...
The concrete plug is driven into the ground by the drop hammer. The pipe is also dragged into the ground due to friction developed between the steel and the concrete. [1] [4] [5] [6] When the desired depth is reached, the pipe is held in position by leads—structures which guide and align the pile and hammer. [7]
Dynamic load testing takes a further step in analyzing the data and computing static capacity and resistance distribution. Dynamic pile monitoring takes advantage of the fact that, for driven piles, it is possible to compute the energy delivered to the pile, compression stresses at the pile top and toe and tension stresses along the shaft.
The Statnamic load test is a type of test for assessing the load-carrying capacity of deep foundations which is faster and less expensive than the static load test.The Statnamic test was conceived in 1985, with the first prototype tests carried out in 1988 through collaboration between Berminghammer Foundation Equipment of Canada and TNO Building Research of the Netherlands.
If a concrete filled pipe pile is corroded, most of the load carrying capacity of the pile will remain intact due to the concrete, while it will be lost in an empty pipe pile. The structural capacity of pipe piles is primarily calculated based on steel strength and concrete strength (if filled).