The resistance path is the total resistance back through the supply transformer; to measure this an engineer will use an "earth fault loop impedance meter". The application of a low voltage allows a small current to pass from the socket back through earth to the supply transformer and distribution board.
There is no 'earth wire' between the two. The fault loop impedance is higher, and unless the electrode impedance is very low indeed, a TT installation should always have an RCD (GFCI) as its first isolator. The big advantage of the TT earthing system is the reduced conducted interference from other users' connected equipment.
Earth continuity test: this test is to make sure the earthing system is properly connected Live testing. Earth fault loop impedance testing: this test is to check that if a fault did occur, that the system meets requirements to cause a disconnection of the supply within the time limit specified by standards Insulation resistance testing
A ground fault (earth fault) is any failure that allows unintended connection of power circuit conductors with the earth. [citation needed] Such faults can cause objectionable circulating currents, or may energize the housings of equipment at a dangerous voltage. Some special power distribution systems may be designed to tolerate a single ...
The connection between neutral and earth allows any phase-to-earth fault to develop enough current flow to "trip" the circuit overcurrent protection device. In some jurisdictions, calculations are required to ensure the fault loop impedance is low enough so that fault current will trip the protection (In Australia, this is referred to in AS3000 ...
Ground loop current induced by stray AC magnetic fields (B, green) Ground loop currents can be induced by stray AC magnetic fields [5] [7] (B, green) which are always present around AC electrical wiring. The ground loop constitutes a conductive wire loop which may have a large area of several square meters.
Earth fault protection also requires current transformers and senses an imbalance in a three-phase circuit. Normally the three phase currents are in balance, i.e. roughly equal in magnitude. If one or two phases become connected to earth via a low impedance path, their magnitudes will increase dramatically, as will current imbalance.
Multifunction testers are able to perform continuity tests (or low ohms resistance tests) and insulation resistance tests (or high ohms resistance tests) and they may also be able to perform earth fault loop impedance tests, prospective short-circuit current tests, earth electrode tests and RCD tests.