enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Floor plan - Wikipedia

    en.wikipedia.org/wiki/Floor_plan

    In architecture and building engineering, a floor plan is a technical drawing to scale, showing a view from above, of the relationships between rooms, spaces, traffic patterns, and other physical features at one level of a structure. Dimensions are usually drawn between the walls to specify room sizes and wall lengths.

  3. The Backrooms - Wikipedia

    en.wikipedia.org/wiki/The_Backrooms

    The original Backrooms image posted on 4chan, of a HobbyTown under renovation.. The Backrooms are a fictional location originating from a 2019 4chan thread. One of the best known examples of the liminal space aesthetic, the Backrooms are usually portrayed as an impossibly large extradimensional expanse of empty rooms, accessed by exiting ("no-clipping out of") reality.

  4. Lofting - Wikipedia

    en.wikipedia.org/wiki/Lofting

    A 1:1 scale construction drawing of a boat and its parts Lines plan A scaled-down version of a full-sized drawing often including the body, plan, profile, and section views Body Plan A view of the boat from both dead ahead and dead astern split in half Plan view A view looking down on the boat from above Profile view A view of the boat from the ...

  5. Pavement condition index - Wikipedia

    en.wikipedia.org/wiki/Pavement_Condition_Index

    The pavement condition index (PCI) is a numerical index between 0 and 100, which is used to indicate the general condition of a pavement section.The PCI is widely used in transportation civil engineering [1] and asset management, and many municipalities use it to measure the performance of their road infrastructure and their levels of service. [2]

  6. Front-end loading - Wikipedia

    en.wikipedia.org/wiki/Front-end_loading

    Front-end loading (FEL), also referred to as Front-End Engineering Design (FEED), Front End Planning (FEP), pre-project planning (PPP), and early project planning, is the process for conceptual development of projects in processing industries such as upstream oil and gas, petrochemical, natural gas refining, extractive metallurgy, waste-to-energy, biotechnology, and pharmaceuticals.

  7. Invert level - Wikipedia

    en.wikipedia.org/wiki/Invert_level

    Conversely, the obvert level is the highest interior level, and can be considered the "ceiling" level, being the highest level of that sewer. The bottom of the sewer is called the invert from a general resemblance in construction to an "inverted" arch. [2] An inverted arch is a rounded structure with its crown facing in the downward position.

  8. Vertical Offshore Reference Frames - Wikipedia

    en.wikipedia.org/wiki/Vertical_Offshore...

    A main product of the VORF project was the gridded vertical correction files which deliver the capability to transfer heights and depths from one vertical reference system to another, "allowing the direct use of depth data from surveys which is referred to a WGS84 compatible datum rather than Chart Datum and thus enabling Hydrographic surveyors to survey without the need to measure tides".

  9. Linear scheduling method - Wikipedia

    en.wikipedia.org/wiki/Linear_scheduling_method

    LSM is used mainly in the construction industry to schedule resources in repetitive activities commonly found in highway, pipeline, high-rise building and rail construction projects. These projects are called repetitive or linear projects.