A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...
An embankment is a raised wall, bank or mound made of earth or stones, that are used to hold back water or carry a roadway. A road , railway line , or canal is normally raised onto an embankment made of compacted soil (typically clay or rock-based) to avoid a change in level required by the terrain , the alternatives being either to have an ...
Heavy construction equipment is usually used due to the amounts of material to be moved — up to millions of cubic metres. Earthwork construction was revolutionized by the development of the scraper and other earth-moving machines such as the loader, the dump truck, the grader, the bulldozer, the backhoe, and the dragline excavator.
Cuts are typically used in road, rail, and canal construction to reduce a route's length and grade. Cut and fill construction uses the spoils from cuts to fill in defiles to create straight routes at steady grades cost-effectively. Cuts are used as alternatives to indirect routes, embankments, or viaducts.
Layers in the construction of a mortarless pavement: A.) Subgrade B.) Subbase C.) Base course D.) Paver base E.) Pavers F.) Fine-grained sand Section through railway track and foundation showing the sub-grade. In transport engineering, subgrade is the native material underneath a constructed road, [1] pavement or railway track (US: railroad track).
Hydraulic fill is likely to be the most economic method of construction. Even when the source material lacks sufficient elevation, it can be elevated to the sluice by a dredge pump. In the construction of a hydraulic fill dam, the edges of the dam are defined by low embankments or dykes which are built upward as the fill progresses. The sluices ...
Advantage of this methodology is possibility to model large deformations, rigid body movements, coupling or failure states between rock blocks. [39] Discontinuous rock mass can be modelled with the help of distinct-element methodology in the form of particle flow code, e.g. program PFC2D/3D.
Formwork for beams takes the form of a box that is supported and propped in the correct position and level. The removal time for the formwork will vary with air temperature, humidity and consequent curing rate. Typical striking times are as follows (using air temperature of 7-16 °C): Form work. Beam sides: 9–12 hours. Beam soffits: 8–14 days.