Search results
Results from the WOW.Com Content Network
The Coles Hydra Speedcrane appeared in 1962, further modified with the 10-ton fully telescopic hydraulic boom in 1966, followed in 1968 by the 30-ton "Husky" military versions with four-wheel drive. In 1972, Steels was forced to merge with the Acrow Group, losing some of their most valuable employees, including Don Hassel and Johnny Johnson who ...
This specific example uses a level luffing mechanism to maintain the load at approximately the same vertical height as the jib moves through its range of travel. A jib or jib arm is the horizontal or near-horizontal beam used in many types of crane to support the load clear of the main support. [1] [2] An archaic spelling is gib. [3]
A level-luffing crane is a crane mechanism where the hook remains at the same level while luffing: moving the jib up and down, so as to move the hook inwards and outwards relative to the base. [1] Usually the description is only applied to those with a luffing jib that have some additional mechanism applied to keep the hook level when luffing.
The long horizontal jib is the part of the crane that carries the load. The counter-jib carries a counterweight, usually of concrete blocks, while the jib suspends the load to and from the center of the crane. The crane operator either sits in a cab at the top of the tower or controls the crane by radio remote control from the ground.
[[Category:Billboard chart templates]] to the <includeonly> section at the bottom of that page. Otherwise, add <noinclude>[[Category:Billboard chart templates]]</noinclude> to the end of the template code, making sure it starts on the same line as the code's last character.
A brig's foremast is smaller than the main mast. The fore mast holds a fore sail, fore top sail, fore top gallant sail, and fore royal. Between the fore mast and the bowsprit are the fore staysail, jib, and flying jib. All the yards are manipulated by a complicated arrangement of cordage named the "running rigging".
Sail plan of a brig. A sail plan is a drawing of a sailing craft, viewed from the side, depicting its sails, the spars that carry them and some of the rigging that supports the rig. [1]
The jib has a radius (reach) of 35 feet (11 m) and a height of 40 feet (12 m). The crane weighs 120 tons. A vertical boiler inside the cab operates at 100 psi and supplies two twin-cylinder steam engines: one for slewing (turning) the crane, a larger one for winding the lifting chain.