Ads
related to: monolithic concrete pour
Search results
Results from the WOW.Com Content Network
The monolithic pour creates concrete beams running throughout the footprint and perimeter of the foundation, with voids between, in one operation. The completed slab then sits on the ground bearing on the ribs created between the forms. The void areas underneath the slab allow for soil movement.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
After the concrete has set the wood may be removed. Formwork can also be permanent, and remain in situ post concrete pour. For large slabs or paths that are poured in sections, this permanent formwork can then also act as isolation joints within concrete slabs to reduce the potential for cracking due to concrete expansion or movement.
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
The concrete mix achieves a high density and cures over time into a strong monolithic block. [22] Roller-compacted concrete is typically used for concrete pavement, but has also been used to build concrete dams, as the low cement content causes less heat to be generated while curing than typical for conventionally placed massive concrete pours.
François Hennebique (26 April 1842 – 7 March 1921) was a French engineer and self-educated builder who patented his pioneering reinforced-concrete construction system in 1892, integrating separate elements of construction, such as the column and the beam, into a single monolithic element. The Hennebique system was one of the first ...
The slab can be decoupled from ground temperatures by insulation, with the concrete poured directly over insulation (for example, extruded polystyrene foam panels), or heating provisions (such as hydronic heating) can be built into the slab. Slab-on-grade foundations should not be used in areas with expansive clay soil.
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Ads
related to: monolithic concrete pour