Search results
Results from the WOW.Com Content Network
F/n = 23 kN per anchor during initial lift (n = 2 lifting anchors) Transport loads in the yard and on-site Suction due to casting bed adhesion is not considered, as the calculation takes into account the lifting device dynamic coefficient. S = (W x Ksl x Kd) / n = (64.8 x 1.16 x 1.2) / 2 = 45.1 kN load resistance required per anchor
ASEP exists in the advancement of structural engineering in the Philippines as well as upholding ethical values in the promotion of national and international professional collaboration with governments, industry and the academe. [4] The organization specifically lobbies on legislation of the Philippines [5] in the national and local levels.
The Philippine Navy released information to tenderers that the ships are to be built with allowance for a 76-millimeter (3.0 in) Oto Melara 76mm Super Rapid main gun, two 30mm Aselsan SMASH secondary guns, either the Rheinmetall Oerlikon Millennium Gun or the Aselsan GOKDENIZ gun-based close-in weapon systems, and 8 manually-operated 12.7mm ...
The Bacolod City-class is the Philippine Navy's main amphibious operation platform prior to the delivery of the Tarlac-class LPD. The two ships were acquired through US Foreign Military Sales (FMS) program. A contract for two ships was announced by Trinity Marine on 3 April 1992, with an option for a third ship which was not taken up.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Concrete has a limited lifespan between batching / mixing and curing. This means that ready-mixed concrete should be placed within 30 to 45 minutes of the batching process to hold slump and mix design specifications in the US, [15] though in the UK, environmental and material factors, plus in-transit mixing, allow for up two hours to elapse. [16]
AOL latest headlines, entertainment, sports, articles for business, health and world news.
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.