enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Construction estimating software - Wikipedia

    en.wikipedia.org/wiki/Construction_estimating...

    A cost estimator will typically use estimating software to estimate their bid price for a project, which will ultimately become part of a resulting construction contract. Some architects, engineers, construction managers, and others may also use cost estimating software to prepare cost estimates for purposes other than bidding such as budgeting ...

  3. 100 mm anti-tank gun T-12 - Wikipedia

    en.wikipedia.org/wiki/100_mm_anti-tank_gun_T-12

    For a static anti-tank that cannot move to attack the sides of an opponent this is particularly problematic. Today, the T-12 is used mostly in the role of ordinary artillery, using FRAG-HE shells. The T-12 was planned to be superseded by the 2A45 Sprut-B 125 mm smooth bore anti-tank gun.

  4. Glossary of construction cost estimating - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_construction...

    A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...

  5. Directional boring - Wikipedia

    en.wikipedia.org/wiki/Directional_boring

    Directional boring machine. Directional boring, also referred to as horizontal directional drilling (HDD), is a minimal impact trenchless method of installing underground utilities such as pipe, conduit, or cables in a relatively shallow arc or radius along a prescribed underground path using a surface-launched drilling rig.

  6. Basis of estimate - Wikipedia

    en.wikipedia.org/wiki/Basis_of_estimate

    A pivot table in BOEMax, a Basis of Estimate software package. To create a BOE companies, throughout the past few decades, have used spreadsheet programs and skilled cost analysts to enter thousands of lines of data and create complex algorithms to calculate the costs. These positions require a high level of skill to ensure accuracy and ...

  7. Boring (manufacturing) - Wikipedia

    en.wikipedia.org/wiki/Boring_(manufacturing)

    Sometimes a part may require higher accuracy of form and size than can be provided by boring. For example, even in optimized boring, the amount that the diameter varies on different portions of the bore is seldom less than 3 micrometre (.0001 inches, "a tenth"), and it may easily be 5 to 20 micrometre (.0002-.0008 inches, "2 to 8 tenths ...

  8. Process duct work - Wikipedia

    en.wikipedia.org/wiki/Process_Duct_Work

    Fabric joints are often chosen to separate the duct segments because they usually cost 40% less than metal joints. Also metal joints place an additional loads onto duct segments. Metal joints prefer axial movements, and provide significant lateral loads onto duct segments. fabric joints cost $100 to $200 per square foot of joint (2010).

  9. Duct (industrial exhaust) - Wikipedia

    en.wikipedia.org/wiki/Duct_(industrial_exhaust)

    Sizing of the ductwork; Calculation of resistance; Finalizing the capacity of blower, etc. [4] The goal is to keep contaminants out using minimum airflow. It is estimated that increase in an inch wg [clarification needed] of static pressure can add a few thousands of dollars to the operation cost per annum.

  1. Related searches 100mm smooth bore ducting machine cost estimate guide form

    100mm smooth bore ducting machine cost estimate guide form pdf