Search results
Results from the WOW.Com Content Network
The top row is a series of plots using the escape time algorithm for 10000, 1000 and 100 maximum iterations per pixel respectively. The bottom row uses the same maximum iteration values but utilizes the histogram coloring method. Notice how little the coloring changes per different maximum iteration counts for the histogram coloring method plots.
Plotting the line from (0,1) to (6,4) showing a plot of grid lines and pixels. All of the derivation for the algorithm is done. One performance issue is the 1/2 factor in the initial value of D. Since all of this is about the sign of the accumulated difference, then everything can be multiplied by 2 with no consequence.
MATLAB (an abbreviation of "MATrix LABoratory" [18]) is a proprietary multi-paradigm programming language and numeric computing environment developed by MathWorks.MATLAB allows matrix manipulations, plotting of functions and data, implementation of algorithms, creation of user interfaces, and interfacing with programs written in other languages.
Two rasterized lines. The colored pixels are shown as circles. Above: monochrome screening; below: Gupta-Sproull anti-aliasing; the ideal line is considered here as a surface. In computer graphics, a line drawing algorithm is an algorithm for approximating a line segment on discrete graphical media, such as pixel-based displays and printers.
R – free implementation of the S (programming language) Programming with Big Data in R (pbdR) – a series of R packages enhanced by SPMD parallelism for big data analysis; R Commander – GUI interface for R; Rattle GUI – GUI interface for R; Revolution Analytics – production-grade software for the enterprise big data analytics
The following MATLAB code will plot the root locus of the closed-loop transfer function as varies using the described manual method as well as the rlocus built-in function: % Manual method K_array = ( 0 : 0.1 : 220 ). ' ; % .' is a transpose.
For r < 1, exists outside [0, 1] as an unstable fixed point, but for r = 1, the two fixed points collide, and for r > 1, appears between [0, 1] as a stable fixed point. When the parameter r = 1, the trajectory of the logistic map converges to 0 as before, but the convergence speed is slower at r = 1.
Extended real numbers (top) vs projectively extended real numbers (bottom). In mathematics, the extended real number system [a] is obtained from the real number system by adding two elements denoted + and [b] that are respectively greater and lower than every real number.