enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. HTR-10 - Wikipedia

    en.wikipedia.org/wiki/HTR-10

    HTR-10 is a pebble-bed high-temperature gas reactor utilizing spherical fuel elements with ceramic coated fuel particles. The reactor core has a diameter of 1.8 metres (5 ft 11 in), a mean height of 1.97 metres (6 ft 6 in) and the volume of 5.0 cubic metres (180 cu ft), and is surrounded by graphite reflectors .

  3. Pebble-bed reactor - Wikipedia

    en.wikipedia.org/wiki/Pebble-bed_reactor

    The 10 megawatt prototype is called the HTR-10. It is a conventional helium-cooled, helium-turbine design. In 2021 the Chinese then built a 211 MW e gross unit HTR-PM, which incorporates two 250 MW t reactors. [21] As of 2021, four sites were being considered for a 6-reactor successor, the HTR-PM600. [21]

  4. Hydrogen-moderated self-regulating nuclear power module

    en.wikipedia.org/wiki/Hydrogen-moderated_self...

    Thus, this reactor design is self-regulating, meltdown is impossible, and the design is inherently safe. From a safety point of view, the design leverages the technology used in the TRIGA reactor, which uses uranium zirconium hydride (UZrH) fuel and is the only reactor licensed by the U.S. Nuclear Regulatory Commission for unattended operation.

  5. HTR-PM - Wikipedia

    en.wikipedia.org/wiki/HTR-PM

    The HTR-PM is a high-temperature gas-cooled (HTGR) pebble-bed reactor. While the German AVR and THTR-300, operating from 1969 to 1988, were the first pebble-bed reactors and operated at similar temperatures, the HTR-PM is the first such design using modular construction and the second small modular reactor, following Russia's Akademik Lomonosov floating plant in 2019.

  6. List of nuclear research reactors - Wikipedia

    en.wikipedia.org/wiki/List_of_nuclear_research...

    HTR-10: Beijing: High Temp Gas Operational 10,000 2000-12-21 MJTR Chengdu: Pool Operational 5,000 1991-03-02 ESR-901 Beijing: Pool-2 Cores Operational 1,000 1964-10-01 NHR-5 Beijing: Heating Prot Operational 5,000 1989-11-03 SPRR-300 Chengdu: Pool Operational 3,000 1979-06-28 HFETR Critical Chengdu: Crit Assembly Operational 0.00 1979-06-20 PPR ...

  7. List of small modular reactor designs - Wikipedia

    en.wikipedia.org/wiki/List_of_small_modular...

    The HTR-PM is a high-temperature gas-cooled (HTGR) pebble-bed generation IV reactor partly based on the earlier HTR-10 prototype reactor. [70] The reactor unit has a thermal capacity of 250 MW, and two reactors are connected to a single steam turbine to generate 210 MW of electricity. [70]

  8. High-temperature gas-cooled reactor - Wikipedia

    en.wikipedia.org/wiki/High-temperature_gas...

    A high-temperature gas-cooled reactor (HTGR) is a type of gas-cooled nuclear reactor which uses uranium fuel and graphite moderation to produce very high reactor core output temperatures. [1] All existing HTGR reactors use helium coolant. The reactor core can be either a "prismatic block" (reminiscent of a conventional reactor core) or a ...

  9. Shidao Bay Nuclear Power Plant - Wikipedia

    en.wikipedia.org/wiki/Shidao_Bay_Nuclear_Power_Plant

    Reactor two achieved first criticality in November 2021. [14] Reactor one was connected to the state power grid and began producing power in December 2021 [15] The HTR-PM project demonstrated it had reached "initial full power" in December 2022. [16] The HTR-PM project finally entered commercial operation in December 2023. [17]