Search results
Results from the WOW.Com Content Network
The joining technology is used in any type of mechanical joint which is the arrangement formed by two or more elements: typically, two physical parts and a joining element. The mechanical joining systems make possible to form a set of several pieces using the individual parts and the corresponding joining elements.
When two such edges are brought together and clamped, the sprung edges create greater tension at the ends of the join, which assists in creating a seamless joint. When using a hand plane to perform this operation, two boards are often clamped face to face in the vice and both jointed at once, creating two edges that are mirror images of one ...
A expansion joint, or movement joint, is an assembly designed to hold parts together while safely absorbing temperature-induced expansion and contraction of building materials. They are commonly found between sections of buildings , bridges , sidewalks , railway tracks , piping systems , ships , and other structures.
The zeppelin is therefore tied with two loose ends (i.e. no existing tension) ending with a simple knot on each, but woven to each other in a pattern specific to zeppelin. Butterfly bend, Hunter's bend, and Ashley's bend also weave one simple knot on either end but use their own different patterns.
Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete. Though it is a cost-effective technique with a shorter completion time, [ 1 ] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.
Aluminium alloys are often used due to their high strength-to-weight ratio, corrosion resistance, low cost, high thermal and electrical conductivity.There are a variety of techniques to join aluminium including mechanical fasteners, welding, adhesive bonding, brazing, soldering and friction stir welding (FSW), etc. Various techniques are used based on the cost and strength required for the joint.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Since the 1950s there have been several attempts to develop theories for arching action in both one and two-way slabs. [5] [6] [7] One of the principal approaches to membrane action was that due to Park [8] which has been used as a basis for many studies into arching action in slabs. Park's approach was based on rigid plastic slab strip theory ...