Search results
Results from the WOW.Com Content Network
English: This diagram depicts the process and benefits of sewage treatment. Sewage treatment helps to protect the environment and all organisms as this process aims to remove contaminants such as bacteria, nutrients, pathogens and any other chemicals that may contaminate surface waters.
He and his colleagues, including William Haywood, designed an extensive underground sewerage system that diverted waste to the Thames Estuary, downstream of the main centre of population. Six main interceptor sewers, totalling almost 160 km (100 miles) in length, were constructed, some incorporating stretches of London's "lost" rivers.
A sewer pipe is normally at neutral air pressure compared to the surrounding atmosphere.When a column of waste water flows through a pipe, it compresses air ahead of it in the system, creating a positive pressure that must be released so it does not push back on the waste stream and downstream traps, slow drainage, and induce potential clogs.
When underground sewer lines are laid close to the ground level (this may be at the depths of less than 0.75 metres (2.5 ft) or 2 metres (6.6 ft) depending on local regulations), an inspection chamber is used as an access point instead. [6] [7] Inspection chambers allow access to sewer lines without requiring a person to get in them. [6]
A force main or rising main [8] is a pumped sewer that may be necessary where gravity sewers serve areas at lower elevations than the sewage treatment plant, or distant areas at similar elevations. A lift station is a sewer sump that lifts accumulated sewage to a higher elevation.
Pressure sewers enable properties constructed below the nearest gravity main to connect to the local sewerage system avoiding the need for a septic tank or cesspit. [4]In areas where washouts or earthquakes are common, conventional earthenware or cast iron sewerage system may be prone to breakage and leakage.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
The first closed sewer constructed in Paris was designed by Hugues Aubird in 1370 on Rue Montmartre (Montmartre Street), and was 300 meters long. The original purpose of designing and constructing a closed sewer in Paris was less-so for waste management as much as it was to hold back the stench coming from the odorous waste water. [64]