Search results
Results from the WOW.Com Content Network
The system can be used to monitor a few zones in boreholes as small as 2-inches, to boreholes up to 20 inches in diameter where numerous depth intervals can be monitored (most installations are in the 4- to 10-inch diameter borehole range) with maximum depth to date of 1,400 feet. Depth-to-water measurements can be made inside the sampling ...
Continuous monitoring and adaptive control (CMAC) is a category of stormwater best management practice that allows for a wider range of operation of detention and retention ponds. CMAC systems typically consist of a water level sensor , an actuated valve , and an internet connection.
In geotechnical engineering, watertable control is the practice of controlling the height of the water table by drainage.Its main applications are in agricultural land (to improve the crop yield using agricultural drainage systems) and in cities to manage the extensive underground infrastructure that includes the foundations of large buildings, underground transit systems, and extensive ...
The first routine measurements of river flow in England began on the Thames and Lea in the 1880s, [2] and in Scotland on the River Garry in 1913. [3] The national gauging station network was established in its current form by the early 1970s and consists of approximately 1500 flow measurement stations supplemented by a variable number of temporary monitoring sites. [2]
The water level at each end of the tube will be at the same elevation, whether the two ends are adjacent or far apart, so a line between them will be horizontal at its midpoint and a shed base, building foundation or similar structure laid out using several such lines will be "horizontal" within building tolerances on any scale over which use ...
River engineering works are only required to prevent changes in the course of the stream, to regulate its depth, and especially to fix the low-water channel and concentrate the flow in it, so as to increase as far as practicable the navigable depth at the lowest stage of the water level.
New ways to deal with water are constantly being developed and tested, such as the underground storage of water, storing water in reservoirs in large parking garages or on playgrounds. [91] Rotterdam started a project to construct a floating housing development of 120 acres (0.49 km 2 ) to deal with rising sea levels. [ 92 ]
Water Sensitive Urban Design with Green Infrastructure in the bottom right corner.. Water-sensitive urban design (WSUD) is a land planning and engineering design approach which integrates the urban water cycle, including stormwater, groundwater, and wastewater management and water supply, into urban design to minimise environmental degradation and improve aesthetic and recreational appeal. [1]