Search results
Results from the WOW.Com Content Network
A tender for a segment of 17.5 km (15.5 km of the South section and 2.5 km of the North section), called lot 3, between the A1 motorway and the DN6 road was launched in July 2017 and awarded in April 2018, to the joint-venture Spedition UMB–Tehnostrade–Artera Proiect, with one year allowed for the design of the motorway and two and a half ...
The subsection is divided into three lots: lot 1, Suplacu de Barcău – Chiribiș (26.3 km); lot 2, Chiribiș − Biharia (28.6 km), and lot 3, Biharia − Borș (5.4 km). In October 2018, the lot 2 was awarded to the Romanian company Trameco, part of the Selina Group, [ 80 ] but this was challenged [ 67 ] and only as of June 2020, the ...
This section of the motorway is fully operational and is composed of two segments: Bucharest – Pitești and Pitești bypass. The Bucharest – Pitești segment (95.9 km) is the first motorway class road built in Romania and remained the only one for more than 15 years, until the completion of the Fetești – Cernavodă segment on the A2 motorway in 1987.
It is divided into two major sections, the northern section and the southern section. The northern section has been widened to four lanes in 2010, [2] between the Chitila and the Voluntari junctions, [3] and a cable-stayed bridge was opened along the ring road in April 2011, in the Otopeni area, which overpasses the railway ring [4] (built by a joint-venture of the Spanish company FCC and the ...
The A7 motorway (Romanian: Autostrada A7), [1] also known as the Ploiești–Siret Motorway (Romanian: Autostrada Ploiești–Siret) or the Moldavia Motorway (Romanian: Autostrada Moldovei), [2] is a partially built motorway in Romania, that upon completion will link Ploiești to the north-eastern part of the country, partly along the Pan-European Corridor IX.
The DEx12 expressway (Romanian: Drumul expres DEx12), also known as the Pitești–Craiova Expressway (Romanian: Drumul expres Pitești–Craiova), is a partially built expressway in the south-western part of Romania, previously labelled as A12, when it was considered as a future motorway. [1]
In total, the network is 80.1 km (49.8 mi) long and has 64 stations, [1] with 1.5 km (0.9 mi) average distance between stops. It is one of the fastest ways to get around the city. The oldest metro line is M1, which was opened in 1979. [2] The newest metro line is M5, which was opened in 2020. [3]
1,435 mm (4 ft 8 + 1 ⁄ 2 in) Societatea de Transport București ( STB ; English: Bucharest Transport Company) is the main public transit operator in Bucharest , Romania , owned by the Municipality of Bucharest.