Search results
Results from the WOW.Com Content Network
Bommanahalli (also known as Roopena Agrahara) is an upcoming elevated metro station on the North–South corridor of the Yellow Line of Namma Metro in Bangalore, India.. As per latest reports, the Yellow Line is slated to be operational around April 2025 [1] instead of January 2025 [2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
The Yellow Line of Namma Metro is a nearly-completed part of the metro rail network of Bengaluru, India.The 18.82 km (11.69 mi)-long line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. [1]
The second 6.4-kilometre (4.0 mi), 6-station stretch (Reach 2) between Mysore Road and Magadi Road opened on 16 November 2015. [113] The underground section, a 4.8 km (3.0 mi) stretch from Cubbon Park to Bengaluru City (KSR) Railway Station opened on 29 April 2016, thus linking the east and west sections that were already opened.
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Bommasandra metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this ...
Out of the operational 68 metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. [2] [3] Evolution of Namma Metro. The first section (on the Purple Line) of the Namma Metro system opened on 20 October 2011 between Baiyappanahalli and M.G Road. The system is ...
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Central Silk Board metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro.
History; Name Extension date Terminals Length Stations Reach 3C: 7 November 2024 [2]: Madavara: Nagasandra: 3.14 km (1.95 mi) [9] 3 Reach 3B: 1 May 2015: Nagasandra
Hongasandra (also known as Garvebhavi Palya) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.. As per latest reports, the Yellow Line is slated to be operational around April 2025 [1] instead of January 2025 [2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.