Column-to-foundation connection [1] Anchor bolts are used to connect structural and non-structural elements to concrete. [2] The connection can be made by a variety of different components: anchor bolts (also named fasteners), steel plates, or stiffeners. Anchor bolts transfer different types of load: tension forces and shear forces. [3]
The vertical contact transfers the gravity load from the beam into the masonry panel, increasing its flexural and shear strength. Instead of the plates transferring the lateral force from the steel to the masonry, shear studs are welded to the bottom side of the beam. Grout is then used to fill the space between the masonry and the steel beam.
The gusset plate is welded to a beam, and then two or three columns, beams, or truss chord are connected to the other side of the gusset plate through bolts or rivets or welds. [3] A uniform force bracing connection connects a beam, column, and one other member. The gusset plate is bolted to the column and welded to the beam.
A steel column is extended by welding or bolting splice plates on the flanges and webs or walls of the columns to provide a few inches or feet of load transfer from the upper to the lower column section. A timber column is usually extended by the use of a steel tube or wrapped-around sheet-metal plate bolted onto the two connecting timber sections.
A reinforced concrete column is a structural member designed to carry compressive loads, composed of concrete with an embedded steel frame to provide reinforcement. For design purposes, the columns are separated into two categories: short columns and slender columns.
The space between the jacket and the column is then filled with concrete, a process called grouting. Where soil or structure conditions require such additional modification, additional pilings may be driven near the column base and concrete pads linking the pilings to the pylon are fabricated at or below ground level.
Each assembly has two parallel steel plates joined by welded stringers or tie bars. The assemblies are then moved to the job site and placed with a crane. Finally, the space between the plate walls is filled with concrete. [1] The method provides excellent strength because the steel is on the outside, where tensile forces are often greatest.
A steel plate shear element consists of steel infill plates bounded by a column-beam system. When these infill plates occupy each level within a framed bay of a structure, they constitute an SPW. Its behaviour is analogous to a vertical plate girder cantilevered from its base. Similar to plate girders, the SPW system optimizes component ...