Material take off (MTO) is a term used in engineering and construction, and refers to a list of materials with quantities and types (such as specific grades of steel) that are required to build a designed structure or item. This list is generated by analysis of a blueprint or other design document. The list of required materials for ...
The marine and air transportation, [9] offshore structures, [10] industrial plant and facility management industries depend on maintenance, repair and overhaul (MRO) including scheduled or preventive paint maintenance programmes to maintain and restore coatings applied to steel in environments subject to attack from erosion, corrosion and environmental pollution.
The list typically is Section C of the Uniform Contract Format and consists of a series of individual data items, each of which is recorded on a Data Item form (DD Form 1423) containing the tailored data requirements and delivery information.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
An example of a BOM for a mechanical assembly (in German) A bill of materials or product structure (sometimes bill of material, BOM or associated list) is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, parts, and the quantities of each needed to manufacture an end product.
This COBie MVD, produced under contract to the Construction Engineering Research Lab, was created by the buildingSMART international Model View Definition support group, and was based on IFC 4. [9] The main standard contains the project's Information Delivery Manual and Model View Definition as well as business case and implementation resources.
In the United States construction industry, contract agreements are usually written to allow the owner to withhold (retain) the final payment to the general contractor as "retainage". [3] The contractor is bound by the contract to complete a list of contract items, called a punch list, in order to receive final payment from the owner.
Quantity take-offs (QTO) are a detailed measurement of materials and labor needed to complete a construction project. They are developed by an estimator during the pre-construction phase. This process includes breaking the project down into smaller and more manageable units that are easier to measure or estimate.