Material take off (MTO) is a term used in engineering and construction, and refers to a list of materials with quantities and types (such as specific grades of steel) that are required to build a designed structure or item. This list is generated by analysis of a blueprint or other design document. The list of required materials for ...
The marine and air transportation, [9] offshore structures, [10] industrial plant and facility management industries depend on maintenance, repair and overhaul (MRO) including scheduled or preventive paint maintenance programmes to maintain and restore coatings applied to steel in environments subject to attack from erosion, corrosion and environmental pollution.
A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
Quantity take-offs (QTO) are a detailed measurement of materials and labor needed to complete a construction project. They are developed by an estimator during the pre-construction phase. This process includes breaking the project down into smaller and more manageable units that are easier to measure or estimate.
An example of a BOM for a mechanical assembly (in German) A bill of materials or product structure (sometimes bill of material, BOM or associated list) is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, parts, and the quantities of each needed to manufacture an end product.
This is a list of building materials.. Many types of building materials are used in the construction industry to create buildings and structures.These categories of materials and products are used by architects and construction project managers to specify the materials and methods used for building projects.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
Maximo is enterprise asset management software originally developed by Project Software & Development (later MRO Software) with the first commercial version released in 1985. [2] [3] Purchased by IBM in 2006, it was branded as IBM Maximo Asset Management. With the release of version 8 in July 2021 the product was renamed to IBM Maximo Manage. [4]