enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. [ 1 ] [ 2 ] During testing, adjustment, calibration, or verification procedures, a load bank is connected to the output of a power source, such as an electric generator ...

  3. Rating plate - Wikipedia

    en.wikipedia.org/wiki/Rating_plate

    The plate frequently contains the names of the machine and its manufacturer, so the rating plate is often called a name plate (hence the term "nameplate capacity" for a generator), although many devices carry separate nameplates and rating plates. [1] For an electric machine, the power rating is the number on its rating plate and corresponds to ...

  4. Proof test - Wikipedia

    en.wikipedia.org/wiki/Proof_test

    A proof test is a form of stress test to demonstrate the fitness of a load-bearing or impact-experiencing structure. An individual proof test may apply only to the unit tested, or to its design in general for mass-produced items. Such a structure is often subjected to loads above those expected in actual use, demonstrating safety and design margin.

  5. Piping and instrumentation diagram - Wikipedia

    en.wikipedia.org/wiki/Piping_and_instrumentation...

    Piping and instrumentation diagram of pump with storage tank. Symbols according to EN ISO 10628 and EN 62424. A more complex example of a P&ID. A piping and instrumentation diagram (P&ID) is defined as follows: A diagram which shows the interconnection of process equipment and the instrumentation used to control the process.

  6. Load rejection - Wikipedia

    en.wikipedia.org/wiki/Load_rejection

    Load rejection in an electric power system is the condition in which there is a sudden load loss in the system which causes the generating equipment to be over-frequency.. A load rejection test is part of commissioning for power systems to confirm that the system can withstand a sudden loss of load and return to normal operating conditions using its governor. [1]

  7. Load path analysis - Wikipedia

    en.wikipedia.org/wiki/Load_path_analysis

    a): load paths based on U* index; b): von Mises stress distribution [2] In the image to the right, a structural member with a central hole is placed under load bearing stress. Figure (a) shows the U* distribution and the resultant load paths while figure (b) is the von Mises Stress distribution. As can be seen from figure (b), higher stresses ...

  8. Open-circuit test - Wikipedia

    en.wikipedia.org/wiki/Open-circuit_test

    Circuit diagram for open-circuit test. The open-circuit test, or no-load test, is one of the methods used in electrical engineering to determine the no-load impedance in the excitation branch of a transformer. The no load is represented by the open circuit, which is represented on the right side of the figure as the "hole" or incomplete part of ...

  9. Power-flow study - Wikipedia

    en.wikipedia.org/wiki/Power-flow_study

    In power engineering, the power-flow study, or load-flow study, is a numerical analysis of the flow of electric power in an interconnected system. A power-flow study usually uses simplified notations such as a one-line diagram and per-unit system, and focuses on various aspects of AC power parameters, such as Voltage, voltage angles, real power and reactive power.