enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Welding Procedure Specification - Wikipedia

    en.wikipedia.org/wiki/Welding_Procedure...

    The American Society of Mechanical Engineers (ASME) similarly defines a WPS as a written document that provides direction to the welder or welding operator for making production welds in accordance with Code requirements. [2] ASME also defines welding PQR as a record of variables recorded during the welding of the test coupon. The record also ...

  3. List of welding codes - Wikipedia

    en.wikipedia.org/wiki/List_of_welding_codes

    ASME BPVC Section IV Rules for Construction of Heating Boilers ASME BPVC Section V: Nondestructive Examination ASME BPVC Section VIII Rules for Construction of Pressure Vessels Division 1 and Division 2 ASME BPVC Section IX: Welding and Brazing Qualifications ASME B16.25: Buttwelding ends ASME B31.1: Power Piping ASME B31.3: Process Piping ASME ...

  4. Welder certification - Wikipedia

    en.wikipedia.org/wiki/Welder_certification

    The ASME code is typically used for pressure vessel and pressure piping applications, and CSA Standards are used for structural, general manufacturing and non-pressure applications. There are 3 major CSA Standards to which welders may be qualified: CSA W47.1 [ 4 ] for steels (including stainless steels), CSA W47.2 [ 5 ] for aluminum, and CSA ...

  5. ASME Boiler and Pressure Vessel Code - Wikipedia

    en.wikipedia.org/wiki/ASME_Boiler_and_Pressure...

    The ASME Boiler & Pressure Vessel Code (BPVC) is an American Society of Mechanical Engineers (ASME) standard that regulates the design and construction of boilers and pressure vessels. [1] The document is written and maintained by volunteers chosen for their technical expertise . [ 2 ]

  6. Process qualification - Wikipedia

    en.wikipedia.org/wiki/Process_Qualification

    Process qualification is the qualification of manufacturing and production processes to confirm they are able to operate at a certain standard during sustained commercial manufacturing.

  7. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    The issuance of a drawing from the engineering/design activity to the production activity. In other words, the event when a draft becomes a completed, official document. A stamp on the drawing saying "ISSUED" documents that RTP has occurred. RTV: room-temperature vulcanizing; return to vendor: 1. RTV sealants, a way to seal joints. 2.

  8. PD 5500 - Wikipedia

    en.wikipedia.org/wiki/PD_5500

    PD 5500 is a specification for unfired pressure vessels.It specifies requirements for the design, manufacture, inspection and testing of unfired pressure vessels made from carbon, ferritic alloy, and austenitic steels.

  9. Flow process chart - Wikipedia

    en.wikipedia.org/wiki/Flow_process_chart

    The first structured method for documenting process flow, e.g., in flow shop scheduling, the flow process chart, was introduced by Frank and Lillian Gilbreth to members of ASME in 1921 as the presentation "Process Charts, First Steps in Finding the One Best Way to Do Work". [2]